Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-5.3.3 Stopping Generator Set.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-5.3.2 Load Transfer.
Up
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Next
2-6 IDENTIFICATION  AND INFORMATION PLATES.

b. c. d. e. f. g. TM  9-6115-660-13&P (7) Refer to TM 9-6115-642-10 and: (a)  Slowly  increase  frequency  of  generator  set  that  was  just  started.  Continue  until SYNCHRONIZING lights (1 and 9) go from bright to dark together at a rate of one or more  times  per  second. (b)  Slowly  decrease  frequency  of  generator  set  that  was  just  started.  Continue  until SYNCHRONIZING lights (1 and 9) blink together at a rate of once every three to four seconds. (8)  When  SYNCHRONIZING  lights  (1  and  9)  are  dark,  hold  the  switch  box  ON/OFF  switch (6 or 4 for the  generator set that was just started to ON position until ON light remains on.  Release  the  switch.  The  ON  LINE  light  for  the  first  generator  set  that  was  running should immediately go out. (9) Check switch box lights, as follows: (a) The ON LINE light (7  or 3)  should  be  lit  for  the  generator  set  that  was  just  started. (b) The ON LINE light (7 or 3) for the other generator set should be off. (10) If lights fail to go on or off, repeat steps (7), (8), and (9). If lights do not function properly, report the problem to the next higher level of maintenance. The  second  generator  set  is  now  supplying  electric  power  to  the  connected  load.  All SYNCHRONIZING lights (1 and 9) should be dark. Refer to TM 9-6115-642-10 and set AC CIRCUIT INTERRUPTER switch for generator set that is  now  offline  to  OPEN  position. Check that switch box ON/OFF switch (6 or 4) for the off line generator set is at center position. Refer to TM 9-6115-642-10 and: (1) (2) (3) Shut down generator set that is now offline. Using generator set VOLTAGE adjustable rheostat, adjust voltage of generator set that is now on line to the desired value. Using generator set frequency adjust control, adjust frequency of generator set that is now on line to desired value. Refer to table 2-2 and perform “After” PMCS for the generator set that was shut down. For the generator set that is now ON LINE, perform the PMCS listed as “During” in table 2-2. 2-5.3.3 Stopping  Generator Set. a. b. c. Set the switch box ON/OFF switch (6 or 4, figure 2-9) for the generator set to be stopped to OFF   position. Stop the generator set in accordance with TM 9-6115-642-10. Perform the generator set PMCS listed as “After” in table 2-2. 2-37