Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-8. Switch Box Load Cable Connections.
Up
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Next
2-5.3.2 Load Transfer.

TM 9-6115-660-13&P 2-3.4.2 Power Unit.  Connect load cables to generator set load terminals.  Refer to operating instructions in TM 9-6115- 642-10. 2-3.5   Positioning   of   Fire   Extinguishers.      Remove   fire   extinguisher(s)   from   bracket(s)   on   trailer.      Locate   fire extinguisher(s) on ground away from power plant/power unit. 2-4 INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST. Refer   to   table   2-2   and   perform   all   "Before"   PMCS.      Refer   to   TM   9-6115-642-10   and   perform   generator   set   initial adjustments, checks, and self tests. 2-5 OPERATING PROCEDURES. 2-5.1 Generator Set Operating Procedures.  Refer to TM 9-6115-642-10. 2-5.2 Trailer Operating Procedures.  Refer to TM 9-2330-202-14&P for Power Units PU-798 and PU-799, TM 9-2330- 392-14&P for PU-798A and PU-799A, and TM 9-2330-213-147P for Power Plants AN/MJQ-37 and AN/MJQ-38. 2-5.3 Power Plant Switch Box Operating Procedures. 2-5.3.1 Operating a Single Generator Set. a. Perform the Preventive Maintenance Checks and Services (PMCS) listed as "Before" in table 2-2. b. Check that both ON/OFF switches (4 and 6, figure 2-9) on switch box are at center position. c. Check that TRANSFER switch (5) on switch box is at bottom position. Figure 2-9.  Power Plant Operation. Change 2  2-35