Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. OPERATION UNDER USUAL CONDITIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Operator Preventive Maintenance Checks and Services - continued
Up
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Next
2-3.2.2  External Fuel Line Connection

TM 9-6115-660-13&P Section III.  OPERATION UNDER USUAL CONDITIONS 2-3 ASSEMBLY AND PREPARATION FOR USE. 2-3.1 Unpacking the Power Plants/Power Units.  Unpacking must be performed by unit level maintenance personnel. 2-3.2 Installation.  Before the power plant/power unit is started and operated, it is towed to the worksite and positioned. 2-3.2.1 Positioning Power Plant/Power Unit. a. Locate the trailer on as level a surface as possible.  This is necessary for efficient operation of the generator set(s). WARNING Do  not  disconnect  trailer  from  towing  vehicle  before  brakes  are  set  and  front  landing leg/support  leg  are  lowered.    Failure  to  observe  this  WARNING  could  result  in  severe personal injury from trailer tipping or rolling. b. Using the two handbrake levers, set trailer brakes securely to prevent any movement. c. Refer to TM 9-2330-202-14&P for uncoupling PU-798 or PU-799 trailer from towing vehicle,  TM 9-2330- 392-14&P for uncoupling PU-798A or PU-799A trailer from towing vehicle, and TM 9-2330-213-14&P for uncoupling AN/MJQ-37 and AN/MJQ-38 trailer from towing vehicle. d. Adjust front landing leg using elevation crank to level the trailer. e. Pull out pin (1, figure 2-4) that secures rear leveling-support jack (2) in travel position. Figure 2-4.  Rear Leveling-Support Jack. a. Remove  ground  rod,  grounding  strap,  and  slide  hammer  (figure  2-6)  from  accessory  storage  box.  Perform assembly steps (1) through (4). WARNING Impact disk must be tightened to end of threads on rod.  Also, lock washer and nut must be tightened firmly against impact disk.  Failure to observe this WARNING could result in severe personal injury and/or death and damage to the equipment. 2-28   Change  2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing