Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-7 PREPARATION FOR MOVEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
24-.7 Power Plant Instruction Plate.
Up
TM-9-6115-659-13P Power Unit PU-732/M (NSN 6115-00-280-3082) MEP-118A 15 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
Figure 2-15. Remove Ground Rod

TM  9-6115-659-13&P 2-7  PREPARATION  FOR  MOVEMENT. 2-7.1 Shut Down Power Plant/Power Unit.  If  power  plant/power  unit  is  operating,  stop  generator  set as follows: 2-7.1.1 Power Plant.  Refer  to  paragraph  2-5.3.3. 2-7.1.2 Power Unit. 2-7.2 a. Stop the generator set in accordance with TM 9-6115-641-10. b. Perform the generator set PMCS listed as “After” in table 2-2. Disconnect Load Cables. 2-7.3 a. b. c. For For Make sure generator sets are shut down before connecting load cables. Failure to observe this warning can cause severe personal injury or death. Power Unit  configuration, refer to TM 9-6115-641-10 and disconnect load cables. Power Plant configuration where load cable is comected to switch box output connector, perform  the  following (1) Disconnect load cable from switch box output connector (6, figure  2-9). (2) Install  cap  (5)  on  output  connector  (6). (3)  Store  load  cable  with  equipment  that  was  being  supplied  with  electric  power. For Power Plant configuration where load cables are connected to switch box load terminals, perform    the  following- (1)  Release  both  clamping  catches  (4)  and  raise  load  terminal  cover  (2). (2)  Using  load  terminal  box  wrench,  loosen  terminal  nuts  (l). (3)  Disconnect  load  cables  from  switch  box  load  terminals  (3). (4)  Store  load  cables  with  equipment  that  was  being  supplied  with  electric  power. Retrieve Ground Cable and Rod. a. b. c. d. Remove wing nut (1, figure 2-8) and flat washer (2). Remove ground cable (b) from ground stud (4). Reinstall flat washer and wing nut on ground stud. Loosen  clamp (9, figure 2-7) and remove ground cable (8) from clamp. Store ground cable in accessory box. Remove slide hammer components from accessory box and assemble as follows: (1) If installed, remove  nut (6, figure 2-7) from rod (4). 2-42

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing