Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-5.3.2 Load Transfer
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-5.3.1  Operating  a  Single  Generator  Set
Up
TM-9-6115-659-13P Power Unit PU-732/M (NSN 6115-00-280-3082) MEP-118A 15 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
2-5.3.3 Stopping Generator Set.

TM 9-6115-659-13&P 2-5.3.2 Load Transfer. a.  For  the  generator  set  that  is  not  operating (1) (2) (3) (4) (5) (6) (7) (8) (9) Refer to table 2-2 and perform the “Before” PMCS. Check that switch box ON/OFF switch (6 or 4) is at center position. Check that switch box TRANSFER switch (5) is at bottom position. Refer to TM 9-6115-641-10 and: (a) (b) (c) (d) Start  the  generator  set. Use generator set VOLTAGE adjustable rheostat to adjust voltage to required value. Using generator set frequency adjust control, adjust frequency to required value. Set AC CIRCUIT INTERRUPTER switch to CLOSED position. Check switch box controls and indicators (figure 2-10) to ensure that: (a) GEN SET ON light  (8 or 2) and ON LINE light (7 or 3) is lit for generator set that has been supplying electric power to the load. (b) GEN  SET ON light  (8 or 2) for  generator  set  just  started  is  lit. Move switch box TRANSFER switch (5) in the direction of the arrow. All SYNCHRONIZING lights (1 and 9) should be going from bright to dark at the same time. If  SYNCHRONIZING lights do not begin to function, report problem to next higher level of maintenance. Refer  to  TM  9-6115-641-10   and: (a) (b) Slowly increase frequency of generator set that was just started. Continue until SYNCHRONIZING lights (1 and 9) go from bright to dark together at a rate of one or more  times  per  second. Slowly decrease frequency of generator set that was just started. Continue until SYNCHRONIZING lights (1 and 9) blink together at a rate of once every three to four seconds. When SYNCHRONIZING lights (1 and 9) are dark, hold the switch box ON/OFF switch (6 or 4) for the generator set that was just started to ON position until ON light remains on.  Release  the  switch.  The  ON  LINE  light  for  the  first  generator  set  that  was  running should immediately go out. Check switch box lights, as follows: (a) The ON LINE light (7 or 3) should be lit for the generator set that was just started. (b) The ON LINE light  (7 or 3) for  the  other  generator  set  should  be  off. (10) If lights fail to go on or off, repeat steps (7), (8), and (9). If lights do not function properly, report the problem to the next higher level of maintenance. 2-38