Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-9. Switch Box Load Cable Connections.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-8.  Power Plant and Power Unit Ground Connections
Up
TM-9-6115-659-13P Power Unit PU-732/M (NSN 6115-00-280-3082) MEP-118A 15 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
2-5.3.1  Operating  a  Single  Generator  Set

TM 9-6115-659-13&P WARNING Make  sure  generator  sets  are  shut  down  before  connecting  load  cables.    Failure  to observe this WARNING can cause severe personal injury or death. 2-3.4.1.1 Connection to Output Connector. a. Remove cap (6, figure 2-9) from output connector (7). b. Connect load cable to output connector (7). WARNING Make  sure  generator  sets  are  shut  down  before  connecting  load  cables.    Failure  to observe this WARNING can cause severe personal injury or death. 2-3.4.1.2 Connection to Switch Box Load Terminals. a. Release both clamping catches (4, figure 2-9) and raise load terminal cover (2). Figure 2-9.  Switch Box Load Cable Connections. b. Select required output terminals from table 2-3. Change 2  2-35