Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-3.4 Connecting Load
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-7. Ground Rod and Slide Hammer.
Up
TM-9-6115-659-13P Power Unit PU-732/M (NSN 6115-00-280-3082) MEP-118A 15 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
Figure 2-8.  Power Plant and Power Unit Ground Connections

TM 9-6115-659-13&P b. Connect ground rod coupling (10) to ground rod (7) and screw slide hammer into coupling (10).  Make sure that slide hammer rod (4) seats on ground rod (7). c. Drive ground rod into ground until coupling is just above surface. d. Remove slide hammer assembly and install another section of ground rod (7). e. Install another  coupling  (10)  and  the  slide  hammer  assembly.    Drive  ground  rod  down  until  new  coupling  is  just above ground surface. f. Repeat steps d and e until ground rod has been driven eight feet or deeper, providing an effective ground. g. Connect clamp (9) and ground cable (8) to ground rod (7) and tighten clamp screw. h. Connect ground cable (8) to trailer as follows. NOTE Ground  terminal  on  high  mobility  trailer  is  different  than one used on other trailers. (1) If the high mobility trailer (AN/MJQ-35A or PU-797A) is being used, perform steps (5) and (6). Otherwise perform steps (2) through (4). (2) Remove and retain wing nut (1, figure 2-8) and flat washer (2) from trailer ground stud (4) and install ground cable terminal lug (3) to ground stud (4). (3) Install flat washer (2) on ground stud (4). (4) Install wing nut (1) on the ground stud (4) and tighten. (5) Loosen nut (5) on high mobility trailer ground terminal (6). (6) Insert wire (7) through slot of ground terminal (6) and tighten nut (5). i. Disassemble slide hammer as follows:  (1) Remove nut (6, figure 2-7) from end of rod (4) and retain. (2) Remove hammer (5) from rod (4) and thread nut (6) on end of rod to prevent loss. (3) Store hammer (5) and rod (4) with assembled parts in accessory box. 2-3.4 Connecting Load. 2-3.4.1 Power Plant.  Load cables and instructions for connecting them are normally furnished with the equipment that is  to  be  supplied  with  electric  power.    The  load  may  be  connected  to  the  switch  box  (1,  figure  2-9)  by  either  of  two arrangements.  One way is to connect a load cable to the switch box output connector (7).  The other way is to connect load  cables  to  the  switch  box  load  terminals  (3).    Before  connecting  the  load,  determine  voltage  requirements  of  the system or equipment that is to receive electric power. Change 2  2-33

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing