Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Operator Preventive Maintenance Checks and Services - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Operator Preventive Maintenance Checks and Services - continued
Up
TM-9-6115-659-13P Power Unit PU-732/M (NSN 6115-00-280-3082) MEP-118A 15 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
Operator Preventive Maintenance Checks and Services - continued

TM 9-6115-659-13&P Table 2-2.  Operator Preventive Maintenance Checks and Services - continued Location Item Interval Procedure Not Fully Mission No. Item to Capable if: Check/Service 3 Before REAR LEVELING- a.  Check rear leveling-support jack (6) for Rear leveling- SUPPORT JACK ease of operation. support jack will not secure in b.  Check rear leveling-support jack (6) for stored position or secure mounting. will not support trailer. c.  Ensure rear leveling-support jack can be locked in stored and support positions. d.  Ensure locking pin (7) is attached to leg with chain (8). e.  Ensure leveling-support jack foot can be adjusted up and down. 2-12  Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing