Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section VI. MAINTENANCE PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 4-6.  No Power At Load Terminal L2 with Switch Set To Operating     Generator And GEN SET Connected for 120/240 VAC
Up
TM-9-6115-658-13P Power Unit PU707A/M (NSN 6115-00-394-9573) MEP-115A 60 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
Figure 4-7.  Power Cable Connections to Switch Box Contactors

TM 9-6115-658-13&P 4-13 Section VI.  MAINTENANCE PROCEDURES 4-10  MAINTENANCE OF GENERATOR SETS. Refer to generator TM 9-6115-639-24. 4-11  MAINTENANCE OF TRAILERS. Refer to TM 9-2330-202-14&P.   4-12  CABLE, POWER MAINTENANCE. This task covers: a. Test   c.    Installation b. Removal INITIAL SETUP Tools Equipment Conditions Tool Kit, General Mechanic's   Reference (item 1, Appendix B) Both generator sets shut down; paragraph Multimeter 2-5.3.3. Make sure generator sets are shut down before performing any electrical maintenance.  Failure to observe this warning could result in severe personal injury or death. TEST 1. Release two clamping catches (11, Figure 4-7) and open switch box cover (1). 2. Disconnect power cable to be tested from generator set load terminals. NOTE Cable leads L1, L2 terminate in switch box at contactor K1 for   Generator 1 (front) and contactor K2 for Generator 2 (rear).  N and Ground   leads terminate at switch box load terminals. 3. Use multimeter to check continuity of each electrical lead in power cable.  Each lead should have continuity between bare end of conductor at generator set load terminal and terminal lug (9).  Check for continuity between lead marked ground and switch box ground load terminal, lead marked N and switch box N load terminal, lead marked L1 and contactor terminal 1, lead marked L2 and contactor terminal 1.  If no continuity, notify next higher level of maintenance. WARNING