Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-5.3.2 Load Transfer.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
2-5    OPERATING PROCEDURES
Up
TM-9-6115-658-13P Power Unit PU707A/M (NSN 6115-00-394-9573) MEP-115A 60 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
2-5.3.3  Stopping Generator Set

TM 9-6115-658-13&P 2-28 g.   Check that switch box ON light (8)or (2) and ON LINE light (7) or (3) for operating generator set   are both lit.  The generator set is now supplying power to the connected load. h.   Refer to Table 2-2 and perform generator set "During" PMCS. 2-5.3.2  Load Transfer. a.   For the generator set that is not operating: (1)    Refer to Table 2-2 and perform the "Before" PMCS. (2)    Check that switch box ON/OFF switch (6) or (4) is at center position. (3)    Check that switch box TRANSFER switch (5) is at bottom position. (4)    Refer to TM 9-6115-639-13 and: (a)    Start the generator set. (b)    Use generator set VOLTAGE adjustable rheostat to adjust voltage to required value. (c)    Set AC CIRCUIT INTERRUPTER switch to CLOSED position. (5)    Check switch box controls and indicators (Figure 2-8) to ensure that: (a)    GEN SET ON light (8) or (2), Figure 2-8 and ON LINE light (7) or (3), Figure 2-8 is lit for generator set that has been supplying electric power to the load. (b)    GEN SET ON light (8) or (2) for generator set just started is lit. (6)    Move switch box TRANSFER switch (5) in the direction of the arrow.  All   SYNCHRONIZING lights (1) should be going from bright to dark at the same time.    If SYNCHRONIZING lights do not begin to function, report problem to next higher level of maintenance. (7)    When SYNCHRONIZING lights (1) are dark, hold the switch box ON/OFF switch (6)or (4) for the generator set that was just started to ON position until ON light remains on.  Release the switch.   The ON LINE light for the first generator set that was running should immediately go out. (8)    Check switch box lights, as follows: (a)    The ON LINE light (7) or (3) should be lit for the generator set that was just started.