Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 2-5 OPERATING PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-7.  Switch Box Load Cable Connections.
Up
TM-9-6115-658-13P Power Unit PU707A/M (NSN 6115-00-394-9573) MEP-115A 60 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
2-5.3.2  Load Transfer.

TM 9-6115-658-13&P 2-27 2-5    OPERATING PROCEDURES. 2-5.1    Generator Set Operating Procedures.  Refer to TM 9-6115-639-13. 2-5.2 Trailer Operating Procedures.  Refer to TM 9-2330-202-14&P. 2-5.3    Power Plant Switch Box Operating Procedures. 2-5.3.1   Operating a Single Generator Set. a.   Perform the Preventive Maintenance Checks and Services (PMCS) listed as "Before" in Table 2-2. b.   Check that both ON/OFF switches (4 and 6, Figure 2-8) on switch box are at center position. c.   Check that TRANSFER switch (5) on switch box is at bottom position. Figure 2-8.  Power Plant Operation. d.   Refer to TM 9-6115-639-13 and: (1)    Start one of the generator sets. (2)    Use generator set VOLTAGE adjustable rheostat to adjust voltage to required value. (3)    Set AC CIRCUIT INTERRUPTER switch on the operating generator set to CLOSED position. e.   Check switch box to make sure that GEN SET ON light (8) or (2) is lit for generator set just started. f.    Set switch box ON/OFF switch (6) or (4) below lit GEN SET ON light to ON position.