Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-7. Switch Box Load Cable Connections.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-6.  Ground Cable Connection
Up
TM-9-6115-658-13P Power Unit PU707A/M (NSN 6115-00-394-9573) MEP-115A 60 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
2-5    OPERATING PROCEDURES

TM 9-6115-658-13&P 2-26 Figure 2-7.  Switch Box Load Cable Connections. b.   Select required output terminals from Table 2-3. Table 2-3.  Load Terminal Voltage GENERATOR OUTPUT TERMINALS VOLTAGE READING 120V 1PH L1 - N 120 VOLTS 120/240V 1PH   L1 - L2 L1 - N L2 - N 240 VOLTS 120 VOLTS 120 VOLTS c.   Using load terminal box wrench located in accessory box, loosen terminal nuts (2) on   terminals (3) selected from table in step b. d.   Insert ends of cables into slots of load terminal studs (3). e.   Tighten load terminal nuts (2) and close clip and load terminal cover (1). 2-3.5  Positioning of Fire Extinguishers.  Remove fire extinguisher(s) (Figure 1-2) from bracket(s) on trailer.   Locate fire extinguisher(s) on ground away from power plant. 2-4  INITIAL ADJUSTMENTS, CHECKS, AND SELF TEST. Refer to Table 2-2 and perform all "Before" PMCS.  Refer to TM 9-6115-639-13 and perform generator set initial adjustments, checks, and self-tests.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing