Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-6. Ground Cable Connection
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-5.  Ground Rod and Slide Hammer.
Up
TM-9-6115-658-13P Power Unit PU707A/M (NSN 6115-00-394-9573) MEP-115A 60 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
Figure 2-7.  Switch Box Load Cable Connections.

TM 9-6115-658-13&P 2-25 g.    Repeat steps e and f until ground rod has been driven eight feet or deeper, providing an effective ground. h.    Connect clamp (9) and ground cable (8) to ground rod (7) and tighten clamp screw. i.     Connect ground cable (8) to trailer as follows. (1)    Loosen nut (1), (Figure 2-6) from trailer ground stud (2). (2)    Insert wire (3) through slot of ground terminal (2) and tighten nut (1). (3)    Insert wire (3) to ground rod clamp (4) and tighten screw (5).   Figure 2-6.  Ground Cable Connection. i.    Disassemble slide hammer as follows: (1)    Remove nut (6), (Figure 2-5) from end of rod (4) and retain. (2)    Remove hammer (5) from rod (4) and thread nut (6) on end of rod to prevent loss. (3)    Store hammer (5) and rod (4) with assembled parts in accessory box. 2-3.4  Connecting Load. Make sure generator sets are shut down before connecting load cables. Failure to observe this warning can cause severe personal injury or death. Load cables and instructions for connecting them are normally furnished with the equipment that is to be supplied with electric power.  The load is normally connected to the switch box load terminals.  Before connecting the load, determine the voltage requirement that is to receive electric power. 2-3.4.1  Connection to Switch Box Load Terminals. a.   Open load terminal cover (1, Figure 2-7). WARNING

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing