Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Operator Preventive Maintenance Checks and Services – (continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Operator Preventive Maintenance Checks and Services – (continued)
Up
TM-9-6115-658-13P Power Unit PU707A/M (NSN 6115-00-394-9573) MEP-115A 60 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
Operator Preventive Maintenance Checks and Services – (continued)

TM 9-6115-658-13&P 2-17 Table 2-2.  Operator Preventive Maintenance Checks and Services – (continued) ITEM NO. INTERVAL LOCATION PROCEDURE NOT FULLY MISSION CAPABLE IF: ITEM TO CHECK/SERVICE 17 Before CONTROLS AND INDICATORS PANEL a. Check all indicators and controls for damage or missing parts. b. Generator start switch (29) should be in “RUN” position. c.  Press PUSH TEST RESET LAMPS button (30) on fault indicator.  All lights must light. d. Return switch (29) to stop position. Indicators or controls damaged or missing. 18 Before CONTROL BOX HARNESS Open control and indicator panel.  Check inside control box for loose or damaged wiring. Loose or damaged wiring. TRAILER 19 During OPERATION a. Be alert for any unusual noises while             towing the trailer.  Stop and investigate any unusual noises. b. Ensure that the trailer is tracking/following correctly behind towing vehicle with no side pull. 20 During SWITCH BOX ASSEMBLY Check indicator lights.  Ensure indicator   Lights are operating properly.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing