Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Operator Preventive Maintenance Checks and Services – (continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Operator Preventive Maintenance Checks and Services – (continued)
Up
TM-9-6115-658-13P Power Unit PU707A/M (NSN 6115-00-394-9573) MEP-115A 60 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Next
Operator Preventive Maintenance Checks and Services – (continued)

TM 9-6115-658-13&P 2-10 Table 2-2.  Operator Preventive Maintenance Checks and Services – (continued) ITEM NO. INTERVAL LOCATION PROCEDURE NOT FULLY MISSION CAPABLE IF: ITEM TO CHECK/SERVICE 3 Before REAR LEVELING- SUPPORT JACK a. Check rear leveling-support jack (5) for          ease of operation. b. Check rear leveling-support jack (5) for          secure mounting. c. Ensure rear leveling-support jack can be       locked in stored and support positions. d. Ensure locking pin (6) is attached to leg         with chain (7). e. Ensure leveling-support jack foot can be        adjusted up and down. Rear leveling- support jack will not secure in stored position or will not support trailer.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing