Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-2. Removal of Roof Panels
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
SECTION IV.  REMOVAL AND INSTALLATION OF MAJOR COMPONENTS
Up
TM-9-6115-604-34 Generator Set Diesel Engine Driven Tactical Skid Mtd 5 Kw. 1 Phase-2 Wire 1 Phase -3 Wire 3 Phase -4 Wire 120. 120/240 and 120/208 Volts Manual
Next
Figure 2-4.  Engine and Generator G1, Removal, Installation, and Alignment (Sheet 1 of 4)

TM 9-6115-604-34 NAVFAC P-8-633-34 Figure 2-2.  Removal of Roof Panels (19) Remove roofing panels 1 through 4 (see Figure 2-2) above the engine in accordance with paragraph 4-13 of the  Operator and Organizational Maintenance Manual and Figure 4-12. (20) Remove the air cleaner assemblies in accordance with paragraph 4-74 of the Operator and Organizational Maintenance Manual. (21)    Remove the cover and screen from the adapter between the generator and engine.  See Figure 2-3. Figure 2-3.  Removal of Cover and Screen (22) See  Figure  2-4,  detail  B.    Bend  back  the  corners  of  the  locking  plates  and  remove  hexagon  head capscrews to disconnect the generator drive discs from the engine flywheel. (23) See Figure 2-4, detail B.  Remove the hexagon head capscrews and washers securing the adapter to the flywheel housing.  Start with the screws nearest the 12 o'clock position and work back and forth around the circle down to the 6 o'clock position. 2-23

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing