Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION I. OPERATING PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
DEENERGIZED LINES AND EQUIPMENT. (cont)
Up
TM-9-6115-604-12 Generator Set Diesel Engine Driven Tactical Skid Rtd. 60 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Figure 2-1.  Engine Control Panel C, Controls and Instruments

ARMY TM 9-6115-604-12 NAVY NAVFAC P-8-633-12 CHAPTER 2 OPERATING INSTRUCTIONS Only properly trained and qualified personnel should operate this equipment.  Do not operate the generator set unless the chassis ground terminal Is connected to a suitable ground.  The generator neutral line is grounded through a transformer for ground fault protection.  The generator neutral line must be grounded.  Failure to comply   with   this   warning   could   cause   loss   of   life   and/or   severe   damage   to equipment. SECTION I.  OPERATING PROCEDURES 2-1.    GENERAL.    This  section  provides  Information  on  how  to  operate  the  generator  set  under  normal  conditions. Conditions other than those covered in Section III of this chapter and where the generator set is functioning properly are considered normal The location and function of the controls and Instruments necessary for operating the generator set are presented in Figure 2-1 through Figure 2-12 and Table 2-1 through Table 2-12.  The purpose of these figures and tables  is  to  enable  the  operator  to  become  familiar  with  these  controls  and  indicators  prior  to  actually  operating  the equipment.    Take  the  time  to  study  these  figures  and  tables  while  inspecting  the  actual  equipment.    The  knowledge gained will greatly improve your ability to operate the generator set.  The step-by-step operating Instructions for starting the   generator   set   are   presented   beginning   with   Figure   2-13.      The   operating   procedures   are   followed   by   detailed Instructions on how to apply an electrical load to the generator, then by procedures for stopping the set.  If equipment malfunctions, refer to the troubleshooting and maintenance procedures In Chapter 3. 2-2.  QUALIFICATION AND LICENSING OF PERSONNEL  .  Qualification and licensing of operator personnel shall be In accordance with: a. (A) U S Army qualification and licensing shall be In accordance with AR 350-224, TB600-1, and USAFESA Supplement 1 to TB600-1 b. (N) U.S.  Navy qualification and licensing shall be accomplished by the local commands licensing agency where the generator unit is deployed 2-3.  CONTROLS AND INSTRUMENTS .  The purpose, location, and normal operating readings or setting of generator set controls and instruments are illustrated in Figure 2-1 through Figure 2-12 and described in Table 2-1 through Table 2- 12. 2-1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing