Back REPLACE FLANGE, BOTTOM, LOWER AND UPPER SIDE | Up TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual | Next REPLACE CONNECTOR PLATE |
TM5-6115-634-14&P
NAVFAC P-8-647-14&P
T0-35C2-3-445-14
TM-6115-14&P/1
4-16. REPLACE FLANGE, BOTTOM, LOWER AND UPPER SIDE (cont)
2.
INSTALL FLANGE LOWER SIDE.
Install lower side flange (6)
with two screws (4) and
lockwashers (5).
3.
INSTALL FLANGE BOTTOM.
Install bottom flange (3) with
four screws (1) and lockwashers
(2).
NOTE
FOLLOW ON MAINTENANCE: Install
Intake Baffle Assembly (Para.
4-14).