Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FABRICATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
REPLACE BATTERY CABLES
Up
TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual
Next
REPLACE  BATTERY  BOX

TM5-6115-634-14&P NAVFAC  P-8-647-14&P T0-35C2-3-445-14 TM-6115-14&P/1 4-11. REPLACE BATTERY CABLES (cont) FABRICATION REPLACE BATTERY CABLE. Replacement of the battery cables is by fabrication (see Appendix  G). INSTALLATION INSTALL BATTERY CABLE. NOTE The negative cable lead is marked with black shrink tubing and the positive cable lead is marked with red shrink tubing. a. Get a new set of battery cables and route cables through the skid base assembly, with con- nector ends for batteries out- wards, and secure the connector strain reliefs to the skid base. b. Secure the negative cable lead (see note), to the starter mounting plate with screw (7), and lockwasher (8). Secure the positive cable lead to the starter solenoid with lock- washer (6) and nut (5). c. Route the cables through the bushing on the battery box. Secure the positive lead to the positive battery terminal connector with lockwasher (4) and nut (3). Secure  the  nega- tive lead to the negative battery terminal connector with lockwasher (2) and nut (1).  Inspect  all  connections to ensure the connections are tight. 4-11

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing