Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CHAPTER 4 UNIT MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Weighing
Up
TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual
Next
Table  4-1.  UNIT  PREVENTIVE  MAINTENANCE  CHECKS  AND  SERVICES

TM5-6115-634-14&P NAVFAC P-8-647-14&P TO-35C2-3-445-14 CHAPTER  4 UNIT  MAINTENANCE  INSTRUCTIONS CHAPTER  INDEX Subject  Index Repair  Parts,   Special  Tools,  Test,  Measurement,  and Diagnostic  Equipment  (TMDE)  and  Support  Equipment Preventive  Maintenance  Checks  and  Services  (PMCS) Troubleshooting Maintenance  Procedures Page 4-1 4-1 4-5 4-7 4-1. Scope Unit maintenance for the PU 794/G is described in Sections I through IV. For trailer  maintenance  instructions,  refer to  TM9-2330-205-14&P,  and  for  the  genera- tor  set,  refer  to  TM5-6115-464-12. Section I. REPAIR  PARTS  AND  SPECIAL  TOOLS,  TEST,  MEASUREMENT, AND  DIAGNOSTIC  EQUIPMENT  (TMDE)  AND  SUPPORT  EQUIPMENT 4-2. Special Tools and Equipment Special  tools  for  the  generator set  are  listed  in  TM5-6116-464-24P. Tools  required  to  perform  unit  mainte- nance are listed in Appendix C of TM5-6115-464-12. b. Special tools for the trailer are listed  in  TM9-2330-205-14&P. c. For authorized common tools and equipment  refer  to  the  Modified  Table  of Organization  and  Equipment  (MTOE)  applic- able to your unit. b. Trailer  repair  parts  are  listed and  illustrated  in  TM9-2330-205-14&P. c. Repair parts are listed and illu- strated  in  Appendix  F  (RPSTL)  covering unit maintenance of the PU 794/G. 4-4. Fabricated  Tools  and  Equipment There is no requirement to fabricate tools for unit maintenance of the PU 794/G. Refer to Appendix G of this manual for the listing of tools and equipment  required. 4-3. Repair  Parts Generator  set  repair  parts  are listed  and  illustrated  in  TM5-6115-464-24P. Section II. PREVENTIVE  MAINTENANCE  CHECKS  AND  SERVICES  (PMCS) 4-5. General PMCS Deficiencies  discovered  during  operation of the unit shall be noted for future To insure that the PU 794/G is ready for correction, to be made as soon as opera- operation at all times, it must be in- tion has ceased. Stop  operation  immedi- spected  systematically  so  that  defects ately if a deficiency is noted during may  be  discovered  and  corrected  before operation  which  would  damage  the  equip- they result in serious damage or failure. ment. All  deficiencies  and  shortcomings 4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing