Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section IV. OPERATION UNDER UNUSUAL CONDITIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Preparation  for  Movement
Up
TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual
Next
Mobile  Operations

TM5-6115-634-14&P NAVFAC  P-8-647-14&P T0-35C2-3-445-14 TM-6115-14&P/1 Nuts must be tight on the slide hammer  rod. Loose hardware may result in serious injury. (3) Place the striker plate (4) on the slide hammer assembly and replace the nut (3) on the slide hammer rod. (4) Connect the slide hammer assembly (2) and slide hammer with the striker plate at the top to the ground rod  coupler  (6). (5) Use the Slide hammer to lift the ground section from the ground. (6) Disconnect the ground rod and remove  nut  (7). (7) Remove the slide hammer from the slide hammer assembly and store it on the front of the trailer. (8) Return the nut (7) to slide hammer assembly and store the assembly in the accessory box. Reset curbside handbrake. Section  IV. OPERATION  UNDER  UNUSUAL  CONDITIONS 2-8.  Mobile  Operations In mobile operations, the PU 794/G sup- plies power while being towed over the highway. The operation of the PU 794/G is the same as normal operation. Two units cannot be paralleled while in mobile operation. The equipment being powered must be grounded to the genera- tor set of the PU 794/G. Care must be taken in the routing of the power, con- trol and ground cables from the PU 794/G to the shelter to preclude damage while the vehicle is moving. To prepare for mobile operation connect the cables as follows: a. Connect the ground cable to the GROUND stud on the connector plate (Figure  2-3). b. Connect the 5-foot (1.52 meter) power cable between the power connector of the connector plate and unit 1 power connector on the junction box (Figure 2-3). c. Connect the 25-foot (7.62 meter) power cable to the load connector of the junction box (Figure 2-3). d. Remove the shorting plug and store in the storage shorting plug connector on the connector plate (Figure 2-3). e. Connect the 5-foot (1.52 meter) control cable between the connector plate control connector and the unit 1 control connection on the junction box (Figure  2-3). 2-18

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing