Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Preparation for Movement
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Single Unit Operating Procedures
Up
TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual
Next
Section  IV. OPERATION  UNDER  UNUSUAL  CONDITIONS

(10) Perform after operation PMCS. 2-6. Remote Operation of Two Pu  794/G’s. Disregard  the  paralleling instructions on the inside of the control panel door. a. Perform before operation PMCS. b. Ensure the PU 794/G’s have been cabled for two PU 794/Gs according to paragraph  2-3c. c. Start PU 794/G unit 1 from the remote control unit according to para- graph 2-5.a. (2) through (4). Unit 1 is now supplying power for normal opera- tion. d. To transfer load, for maintenance, start PU 794/G unit 2 from the remote control unit as follows: (1) Start PU 794/G unit 2 by placing the SET No. 2 ENGINE switch on the remote control unit in the START position and hold until the ENG RUNNING lamp  lights. (2)  Turn  the  FREQ  ADJUST  control for SET No. 2 slowly until the SYN LIGHT changes intensity at 3 to 5 second inter- vals. (3) Watch the light carefully. When the light achieves the dimmest point, move the CONTACTOR switch to the CLOSE position and hold until the CON- TACTOR CLOSED lamp lights. (4) The two PU 794/Gs are now sharing the load. (1) Place the CONTACTOR switch of SET No. 1 in the OPEN position. TM5-6115-634-14&P NAVFAC  P-8-647-14&P TO-35C2-3-445-14 TM-6115-14&P/1 (2) Allow the PU 794/G unit 1 to operate without a load for 3 minutes. (3) Place the ENGINE switch of SET No. 1 in the STOP position. f. Perform after operatin PMCS. 2-7. Preparation  for  Movement Lethal voltages are present at the load connection board of the generator set during operation. Do not attempt to connect or disconnect load leads while the generator set is  operating. Do not attempt to connect or disconnect load leads with the generator set shut down and the load con- nected  to  another  power  source, or while the generator set is paralleled to another unit which is operating. Serious injury or death by electrocu- could  result. a. Disconnect the cables from the shelter, the junction box and the con- nector plate. b. Disconnect the ground wire from the connector plate and ground rod. c. Store the power cables and ground wire in the cable pan. Store the con- trol cables and paralleling cable on the cable  reel. d. Remove the ground rod. (1) Release the curbside hand- brake. Remove the slide hammer (1) from the front of the trailer. Remove the slide hammer assembly (2) from the acces- sory,  box. (2) Remove the nut (3) from the slide hammer assembly and place slide hammer over the rod (5). 2-17