Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. PRINCIPLES OF OPERATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Tabulated Data
Up
TM-5-6115-634-14P Power Plant AN/MJQ-16 (NSN 6115-00-033-1395) (2) MEP-002A 5 Kw 60 Hz Generator Sets M103A3 2-Wheel 2-Tire Modified Trailer Manual
Next
Figure  1-3. Identification  Plates

TM5-6115-634-14&P NAVFAC  P-8-647-14&P TO-35C2-3-445-14 TM-6115-14&P/1 b. Trailer. The trailer is a modi- fied M200A1, 2 1/2 ton, 2-wheel trailer. Towing Facilities Lunette Towing Vehicle 5-ton 6x6 Brakes Air over hydraulic Handbrakes Mechanical, handlever controlled Tires Pneumatic, normal use 35 psi (3.16 kg/sq cm). In mud, snow and sand use 15 psi (1.06  kg/sq cm). 24 VDC Voltage (lighting) c.  PU   794/G Figure 1-3 shows the data plates identifying the PU 794/G. Length 181 inches (459.74 cm) Width 97 inches (246.34 cm) Height 98 inches (248.92 cm) Weight 6440 lbs (2921.18 kg) Operating Range -1O°F to 110°F (-24°C to 43°C) at sea level -lO°F to 95°F (-24°C to 35°C) up to 3000 feet (914.4 M) Maximum 150 (26 percent) slope from the level in any direction Section III. PRINCIPLES  OF  OPERATION 1-11. Principles of Operation trailer can be towed over prepared roads at a maximum speed of 55 mph (88.5 km/h), The PU 794/G provides 20 kW, 60 HZ pre- and over unimproved roads at a maximum cise power. It is noise suppressed and speed of 30 mph (48.3 km/h). It will EMP  protected. It is designed to be ford hard-bottom water crossings to any operated and paralleled remotely from a depth that can be negotiated by the towing distance up to 100 feet (30.48 M). The vehicle. Section IV. SERVICE  UPON  RECEIPT 1-12. Unpacking/Uncrating the PU 794/G g. Lift the generator and remove the plywood shipping base from the trailer. a. Remove the packing list from the right front side of the crate and set h. Set the generator back on the aside. trailer and reinstall the mounting bolts. b. Using metal cutters, cut the band from around the crate. i. Remove the packing material from the battery box, cable tray, accessory c. Remove the crate from the top of box , the generator set. d. Cut the barrier paper along the from base of generator set. k. j. and the document box compartment. Remove the bands and plywood cap the cable reels. Use the packing list and inventory e. Remove the barrier paper and des- the accessories. Report any discrepan- sicant  bags. cies to your supervisor. f. Remove the mounting bolts that 1. Remove  all  packing/cushioning mount the generator to the trailer. material from the cables and tools. 1-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing