Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-4.  Radiator Assembly, Removal and Installation
Up
TM-5-6115-593-34 Generator Set Diesel Engine Driven Tactical Skid Mtd. 600 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Figure 2-5.  Engine, Removal and Installation.

TM5-6115-593-34 NAVFAC P-8-631-34 TO-35C2-3-463-2 (e)   Using a forklift of at least 10-ton capacity, lift engine off skid base and place engine on a suitable engine stand. b.  Installation. WARNING CLEAR  AREA  OF  PERSONNEL  AND  OTHER  EQUIPMENT  WHEN  ATTEMPTING  TO  LIFT  THE ENGINE. (1) If engine will be installed with an overhead crane or hoist, proceed as follows: (a)   Remove housing roof panels and silencer frame tie bar and support tie bar and support if these components were installed after engine removal. WARNING OVERHEAD   OPERATIONS   HAVE   INHERENT   HAZARDS   THAT   CANNOT   BE   MECHANICALLY SAFEGUARDED.  HARD HATS AND SAFETY SHOES ARE REQUIRED. (b)   Attach a suitable lifting device of at least 10-ton capacity to the engine hoist brackets. WARNING LIFTING  DEVICES,  CABLES,  AND/OR  CHAINS  SHOULD  BE  INSPECTED  FOR  DETERIORATION OR  DAMAGE  BEFORE  USE.    A  STABILIZING  TETHER  SHOULD  BE  ATTACHED  BETWEEN  THE ENGINE  AND  LIFTING  HOOK  FOR  ADDED  SAFETY  AND  STABILIZATION  WHEN  LIFTING  THE UNIT. (c)   Position engine on skid base and couple engine to generator.  Align in accordance with paragraph 11-5 b(2). (d)   Reinstall housing roof panels and silencer frame tie bar. (2) If engine will be installed with a forklift proceed as follows: (a)   Remove  housing  roof  panels,  side  panels  and  doors,  and  vertical  support  frames  if  these  components  were reinstalled after engine removal. (b)   Using a forklift of at least 10-ton capacity, mount engine on skid base and align with generator in accordance with paragraph 11-5 b(2). (c)   Reinstall housing roof panels, side panels and doors, and vertical support frames. (3) Secure engine with engine mounting bolts. (4) Install radiator fan motor and fan belts as required. (5) Reconnect  fuel  lines,  coolant  hoses,  and  all  electrical  wiring  harness  connections.    Remove  wire  tags  after making connections. (6) Connect hoses to air cleaners, air shutoff valves, and turbochargers. (7) Connect exhaust breather pipes. (8) Replace coolant and fill to proper level check for leaks (9) Fill engine crankcase with proper lubricant.  Check dipstick level at crankcase and governor pump. (10) Reconnect batteries. 2-14