Back Figure 2-2. AC-DC Control Box Assembly, Removal and Installation | Up TM-5-6115-593-34 Generator Set Diesel Engine Driven Tactical Skid Mtd. 600 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual | Next Figure 2-3. External Power Box Assembly, Removal and Installation (Sheet 2 of 2) |
TM5-6115-593-34
NAVFAC P-8-631-34
TO-35C2-3-463-2
Figure 2-3. External Power Box Assembly, Removal and
Installation (Sheet 1 of 2)
NOTE
Be careful not to tear off cable tags in process.
circuit breaker. Also, remove bolts, washers and nuts that secure buss bars to vertical buss bars in
reconnection box. Remove bars through slot in external power box.
(7)
Referring to figure 2-3, remove screws, washers, and nuts attaching external power box assembly to the frame
support upright.
(8)
Remove screws, washers, and nuts attaching bottom of the external power box assembly to skid base.
WARNING
OVERHEAD OPERATIONS HAVE INHERENT HAZARDS THAT CANNOT BE MECHANICALLY
SAFEGUARDED. HARD HATS AND SAFETY SHOES ARE REQUIRED.
(9)
Remove control cable per paragraph 2-13.
(10)
Using hoist, remove external power box assembly.
b. Installation
(1)
Attach suitable hoist to the external power box assembly.
2-10
|