Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-9. Preparation for Starting with Housing Kit Installed (Sheet 1 of
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-8.  Single Generator Unit, Operating Instructions
Up
TM-5-6115-593-12 Power Plant Utility (MUST) Gas Turbine Engine Driven (AMERTECH Corp Model APP-1) Manual
Next
Figure 2-9.  Preparation for Starting with Housing Kit Installed (Sheet 2 of 3)

TM 5-6115-593-12 TO 35C2-3-463-1 Section II.  OPERATION OF AUXILIARY MATERIAL USED IN CONJUNCTION WITH THE EQUIPMENT 2-8.    GENERAL.    This  section  provides  step-by-step procedures with supporting illustrations for operating the generator  set  in  conjunction  with  the  auxiliary  housing kit,   the   remote   control   module   and   cable,   and   the automatic control module. 2-9.      OPERATION   WITH   THE   HOUSING   KIT.   The auxiliary housing kit encloses the top, sides, and ends of the generator set and is removable to provide access for overhaul  or  replacement  of  major  components  of  the generator   set.      The   housing   is   attached   to   the   base assembly and the support frame assembly to provide a rain-proof  enclosure,  and  prevent  rain,  snow,  or  sand from  entering  the  interior  of  the  housing.    The  housing doors  allow  access  to  the  inside  of  the  generator  set. The    shutter    assembly    at    the    radiator    end    of    the generator  set  is  automatically  controlled  and  opens  as necessary to facilitate air circulation.  Installation of the housing   kit   extends   the   operational   capability   of   the generator set down to temperatures from 40°F to -25°F (4.4°C  to  -32°C).    Preparation  procedures  for  starting the generator set with the housing kit installed are given in figure 2-9. STEP 1. CHECK LUBRICATING AND COOLANT LELS. STEP 2. CHECK AIR BOX DAMPER POSITION AND RESET MANUALLY TO OPEN IF P E.  S  FIG.  2-5 SHEET 1. STEP 3. CHECK BATTERY TERMINALS,  S (-) TO GROUND. STEP 4. PLACE 24V DC CONTROL CIRCUIT BREAKER TO ON POSITION ON GENERATOR PANEL. STEP 5. ENSURE MAINTENANCE SWITCH IS IN OPERATION POSITION ON AC-DC CONTROL PANEL. STEP 6. CHECK FUEL LEVEL AND SIDE DOOR SHUTTER OPERATION BY PLACING BATTLE SHORT SWITCH IN   THE   ON   POSITION   ON   GENERATOR   PANEL   AND   THEN   THE   MASTER   SWITCH   IN   START POSITION ON ENGINE PANEL. STEP 7. RETURN MASTER SWITCH TO STOP AND THEN THE BATTLE SHORT SWITCH TO OFF. STEP 8. CHECK ENG FAULT INDICATORS BY PLACING  ANNUNCIATOR TEST SWITCH IN TEST POSITION ON GENERAL PANEL..  IF NONE OF THE LIGHTS ARE ON AFTER BEING TESTED PROCEED WITH THE NEXT    STEP.        IF    A    LIGHT    DOES    COME    ON,    CORRECT    THE    INDICATED    FAULT    BEFORE PROCEEDING. STEP 9. CHECK  VOLTAGE  AND  FREQUENCY  OF  THE  LOAD  AGAINST  THE  VOLTAGE  AND  FREQUENCY CONNECTION OF THE SET. STEP 10. ENSURE THAT THE SHUTTERS ON THE RADIATOR END OF THE SET ARE NOT MANUALLY LOCKED OPEN. STEP 11. CLOSE ALL DOORS EXCEPT CONTROL BOX END. STEP 12. PLACE AUTO/TRIP/MAN SELECTOR SWITCH IN MAN POSITION. Figure 2-9.  Preparation for Starting with Housing Kit Installed (Sheet 1 of 3) 2-20