STEP 1.
PREPARE GENERATOR SET FOR STARTING (FIGURE 2-5).
STEP 2.
START GENERATOR SET (FIGURE 2-6).
STEP 3.
ROTATE AMMETER SWITCH TO EACH PHASE POSITION, WHILE OBSERVING AMMETER. IF MORE
THAN 100 PERCENT RATED CURRENT IS INDICATED IN ANY PHASE POSITION, REDUCE THE LOAD.
STEP 4.
IF MORE THAN 100 PERCENT LOAD IS INDICATED OK THE KW METER, REDUCE THE LOAD.
Figure 2-8. Single Generator Unit, Operating Instructions
2-19
|