Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-5. Preparation for Starting (Sheet 3 of 3)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-5. Preparation for Starting (Sheet 2 of 3)
Up
TM-5-6115-593-12 Power Plant Utility (MUST) Gas Turbine Engine Driven (AMERTECH Corp Model APP-1) Manual
Next
Figure 2-6. Starting Instructions (Sheet 1 of 3)

TM 5-6115-593-12 TO 35C2-3-463-1 WARNING DO  NOT  OPERATE  THE  GENERATOR  SET  UNLESS  THE  GROUND  TERMINAL  STUD  HAS  BEEN CONNECTED TO A SUITABLE GROUND.  ELECTRICAL FAULTS IN THE GENERATOR SET, LOAD LINES,     OR     LOAD     EQUIPMENT,     CAN     CAUSE     INJURY     OR     ELECTROCUTION     WITH     AN UNGROUNDED SYSTEM. WARNING MAKE  SURE  THAT  NO  TOLLS,  PARTS,  OR  LOOSE  ITEMS  ARE  ON  ANY  PART  OF  THE  ENGINE SINCE THEY MIGHT CAUSE BODILY HARM TO PERSONNEL WHEN THE ENGINE IS STARTED. CAUTION IF ENGINE DOES NOT START IN 45 SECONDS, OVERCRANK PROTECTION WILL TERMINATE THE CRANKING CYCLE.  RESET AND ALLOW 1-MINUTE REST BEFORE STARTING ANOTHER CRANK CYCLE. Figure 2-5.  Preparation for Starting (Sheet 3 of 3) 2-14

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing