Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 5-8. Checking Armature Shaft Runout
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure  5-4.    Testing  Armature  for  Grounds
Up
TM-5-6115-585-34 Generator Set Diesel Engine Driven Tactical Skid Mtd 5 KW 1 Phase 2 Wire 1 Phase-3 Wire 3 Phase-4 Wire 120 120/240 and 120/208 Volts Manual
Next
Figure 5-9.    Testing  Brush  Spring  Tension STYLE I Starter Only

TM5-6115-585-34 NAVFAC   P-8-623-34 TO-35C2-455-2 TM-05684C/05685B-34 (d) Testing Commutator Runout. Place the (e) Testing Armature Shaft Runout. armture  in  a  test  bench  and  check  runout  with  a Place armature in a test bench and check shaft dial indicator. See figure 5-7. When commutator runout with a dial indicator. Runout should not runout exceeds 0.004 inch, commutator should be exceed 0.006 inch. See figure 5-8. If shaft is refaced. After refacing commutator, check that it bent or worn, armature must be replaced. meets  minimum  specifications.  Check  and  if necessary, undercut mica as given under repair. Figure 5-7. Checking cummutator Runout Figure 5-8.    Checking  Armature  Shaft  Runout 5-6 Change  8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing