Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-2. Disconnecting Engine from Generator
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure   2-1.   Speed   Control   Assembly
Up
TM-5-6115-585-34 Generator Set Diesel Engine Driven Tactical Skid Mtd 5 KW 1 Phase 2 Wire 1 Phase-3 Wire 3 Phase-4 Wire 120 120/240 and 120/208 Volts Manual
Next
Figure 2-3. Lifting  Engine

TM   5-6115-585-34 NAVFAC   P-8-623-34 TO-35C2-3-455-2 TM-05684C/05685B-34 Figure 2-2. Disconnecting Engine from Generator housing. Manual. (b)  Remove  center  plug  from  grille  on  blower Refer to Operator and Organizational Maintenance (c)   Using   a   5/8”   socket   wrench   on   hex   head capscrew  at  center  of  blower  wheel,  rotate  engine  clock- wise  until  one  of  the  four  sets  of  screws  (1,  figure  2-2) attaching  generator  fan  (4)  and  coupling  plate  to  engine flywheel  is  accessible  thru  opening  in  generator  housing (8).  Straighten  locking  tabs  and  remove  the  two  screws (1) and the locking plate (2) and pressure plate (3). (d)  Rotate  engine  an  additional  90°  and  remove second  set  of  screws.  Continue  until  all  four  sets  of  screws (1) are removed. (e)   Remove   twelve   nuts   (5)   and   lockwashers (6)  attaching  generator  housing  (8)  to  engine(7). (11)   Remove   four   screws   (3,   figure   2-3),   lock- washers  (5),  flatwashers  (4)  and  nuts  (6)  attaching  each engine  mount  (2)  to  skid-base  (7).  Lift  engine  free  of Generator  Set. b. Installing Engine-Generator Assembly. (1)  Attach  generator  to  engine. (a)  Install  two  1/4-20  x  2  in.  pilot  studs  into the  engine  flywheel  (9,  figure  2-2)  in  two  holes  that  are 180°  apart. (b)   Align   fan   (4),   adapter   plate   and   flywheel (9) using pilot studs. (c)   Install   four   screws   (1),   locking   plate   (2), pressure plate (3) attaching fan and adapter to flywheel (9). (d)   Remove   pilot   studs   and   install   remaining screws (1), locking plates (2) and pressure plate (3). (e)  Bend  locking  plates  (2)  to  lock  all  screws  (1). (f)   Install   twelve   nuts   (5)   and   lockwashers   (6) to attach generator housing (8) to engine (7). (g)  Check  engine  lifting  bracket  for  proper  torque of  50  foot-pounds. (2)   Lift   engine   generator   assembly   into   place   on skid-base   and   install   screws   (3,   figure   2-3),   lockwashers (5),  flatwashers  (4)  and  nuts  (6)  to  attach  engine  mounts to skid base. (3)   Attach   engine   speed   control   (3,   figure   2-1)   to bracket (5) and tighten nut (1). (4)   Refer   to   Operator   and   Organizational   Mainte- nance Manual and proceed as follows: (a) removed. (b) (c) base. (d) tion pump. (e) (f) Install  generator Install fuel tank. Connect  oil  drain Connect  fuel  lines screen-guard   if   previously hose  to  mounting  on  skid- to fuel fiiter and fuel injec- Install air filter assembly. Reconnect  previously  tagged  wire  harnees  to engine   (see   schematic   figure   1-1). (g)  Connect  cables  to  starter. (h)  Install  batteries  and  reconnect. 2-14 Change 5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing