Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section V. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Section   II.   MOVEMENT   TO   A   NEW   WORKSITE
Up
TM-5-6115-585-12 Generator Set Diesel Engine Driven Tactical Skid Mtd 5 KW 1 Phase 2 Wire 1 Phase-3 Wire 3 Phase-4 Wire 120 120/240 and 120/208 Volts Manual
Next
TABLE  4-1. ORGANIZATIONAL   PREVENTIVE   MAINTENANCE   CHECKS   AND   SERVICES--continued

T M 5 - 6 1 1 5 - 5 8 5 - 1 2 NAVFAC P-8-262-12 TO - 35C2 - 3 - 455 - 1 TM-05684C-12 ( 1 0 )     A p p l y     a     t h i n     c o a t     o f     c l e a n     e n g i n e     o i l , ( 1 2 )     P o u r     6 . 5     q u a r t s     o f     e n g i n e     o i l     ( s e e     l u b r i - M I L - L - 2 1 0 4     t o     a     n e w     g a s k e t     ( 4 )     I n s t a l l     n e w     g a s k et cation   order   for   proper   grade   of   oil)   into   oil   fill   tube (4)   in   groove   of   adapter   (5). (9,   figure   1-1). (11)   Assemble   components   on   through   belt   (2)   in (13)   Check   oil   level   with   dip-stick. the   order   shown   in   figure   4-30.   Position   body   (3)   with drain   plug   (1)   down   on   adapter   (5).   Tighten   through   bolt (14)   After   5   minutes   of   engine   operation,   check (2)  to  13±  2ft-lb  dry. crankcase   oil   level   and   bring   oil   level   to   full   mark. Section   V.   PREVENTIVE   MAINTENANCE   CHECKS   AND   SERVICES   (PMCS) 4-8.  PMCS,    GENERAL. To   ensure   that   the   Generator   Set   is   ready   for   operation at   all   times,   it   must   be   inspected   systematically   so   defects may   be   discovered   and   corrected   before   they   result   in serious   damage,   failure   or   safety   hazard.   The   necessary preventive   maintenance   checks   and   services   that   are   to be   performed   by   Organizational   personnel   are   listed   and described   in   the   following   paragraphs.   Defects   discovered during   operation   will   be   noted   for   future   correction.   Stop operation   immediately   if   a   deficiency   is   noted   which   would damage   the   equipment   or   present   a   safety   hazard.   All faults   will   be   recorded   together   with   the   corrective   actions taken   on   the   applicable   form.   Air   Force   users   shall   refer to   the   applicable   inspection   manuals   and   work   card   sets in   the   TO   35C2-3-1-426   series   for   periodic   requirements. Marine   Corps   users   should   refer   to   current   issue   of   TM 4700-15/1.   On   ASK   equipped   generators,   full   or   partial removal   of   ASK   may   be   necessary   to   perform   PMCS. 4 - 9 .    D e t e r m i n i n g    P M C S    I n t e r v a l s .    O r g a n i z a t i o n al PMCS   on   this   unit   should   be   performed   on   a   -   per h o u r s    o f    o p e r a t i o n    - b a s i s .    T h e    r u n n i n g    t i m e    m e t er on   the   control   panel   should   be   used   to   determine   the Generator   Set   operating   time. 4-10.    PMCS    for    Units    in    Continuous    Operation.    For P M C S     p e r f o r m e d     o n     a n     o p e r a t i n g     t i m e     b a s i s ,     p e r - form   PMCS   as   close   as   possible   to   the   time   intervals indicated.   For   units   in   continuous   operation,   perform PMCS   before   starting   operation   if   continuous   opera- t i o n    w i l l    e x t e n d    s e r v i c e    i n t e r v a l    p a s t    t h a t    w h i c h    is shown. 4-11.   (A.   N,   MC)   Preventive   Maintenance   Checks   and S e r v i c e s . T a b l e     4 - 1     c o n t a i n s     a     t a b u l a t e d     l i s t i n g     of P M C S     w h i c h     s h a l l     b e     p e r f o r m e d     b y     O r g a n i z a t i o n al personnel.   The   item   numbers   are   listed   consecutively and   indicate   the   sequence   of   minimum   requirements. Table   4-1. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES C h a n g e     8     4 - 5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing