Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 4-1. Uncrating Generator Set
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
C H A P T E R   4 O R G A N I Z A T I O N A L    M A I N T E N A N CE
Up
TM-5-6115-585-12 Generator Set Diesel Engine Driven Tactical Skid Mtd 5 KW 1 Phase 2 Wire 1 Phase-3 Wire 3 Phase-4 Wire 120 120/240 and 120/208 Volts Manual
Next
Grounding.   The   Generator   Set   must   be   grounded

TM5-6115-585-12 NAVFAC   P-8-623-12 TO-35C2-3-455-1 TM-05684C/05685B-12 Figure   4-1.   Uncrating   Generator   Set Do   not   smoke   or   use   an   open   flame   in   the   vicini- ty   when   servicing   batteries.   Battaries   generate hydrogen,    a    highly    explosive    gas.    Electrolyte c o n t a i n s    s u l p h u r i c    a c i d    a n d    c a n    c a u s e    s e v e r e burns.   Handle   it   with   care.   If   the   solution   comes in   contact   with   the   body,   eyes   or   clothing,   rinse i m m e d i a t e l y    w i t h    c l e a n    w a t e r .    A v o i d    s p i l l i n g electrolyte   on   painted   surfaces. (9)   Check   crankcase   oil   level   (paragraph   3-2)   and add   oil   as   necessary   (paragraph   3-3)   in   accordance   with the   lubrication   order   (figure   3-1). b.   Outdoor   Installation.   When   preparing   for   a   per- manent   installation,   be   sure   the   base   is   solid   enough   to support   the   weight   of   the   unit.   See   figure   1-4   for   dimen- sions   of   the   bas.   Seclect   a   location   where   there   will   be sufficient   space   on   all   sides   for   servicing   and   operation of   the   engine   Generator   Set.   When   preparing   a   tem- porary   installation,   move   the   engine   Generator   Set   as close   to   the   worksite   as   practical.   Use   suitable   planks, logs,   or   other   material   for   a   base   in   an   area   where   the ground   is   soft. c.   Indoor   Installation.   Keep   the   area   wall   ventilated a t     a l l     t i m e s ,     s o     t h a t     t h e     e n g i n e     G e n e r a t o r     S e t     w i ll receive   a   maximum   supply   of   air.   If   a   free   supply   of fresh   air   is   not   available,   provide   duct   work   which   will assure   the   required   ventilation   (refer   to   paragraph   1- 10.b.(1).).   If   louvers   are   used   at   the   air   entrance,   in- 4-2.   I N S T A L L I N G     G E N E R A T O R     S E T. crease   the   duct   work   size   by   25   to   50   percent.   Install   a gas-tight   metal   pipe   exhaust   from   the   exhaust   outlets a.   General.   The   engine   Generator   Set   should   be   in- to   the   outside   of   the   installation.   The   termination   of the   exhaust   pipe   shall   be   such   that   hot   gases   or   sparks stalled   on   a   site   clear   of   obstacles,   with   ample   ventila- tion   and   level   within   ±15   degrees   maximum. will   be   discharged   harmlessly   and   will   not   be   directed against   combustible   material   or   into   an   area   contain- 4-2 Change   4

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing