Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 6-3. Control Cubicle (Sheet 2 of 2)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 6-3. Control Cubicle (Sheet 1 of 2)
Up
TM-5-6115-584-34 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Figure  6-4.  Testing  Voltage  Regulator

T M    5 - 6 1 1 5 - 5 8 4 - 34 NAVFAC   P-8-622-34 TO-35C2-3-456-2 1.  Screw 20.  Rheostat 2.  Nut 39.    Regulator 21.  Switch 40.   Link 3.   Holder 22.  Switch 41.  Screw  (2) 4.   Terminal   (2) 23.  Switch 42.  Nut  (2), 5. Hook 24.  Screw  (2) 43.   Relay 6.   Screw 25.   Circuit   breaker 44.  Screw  (2) 7.  Nut 26.   Nut(4) 45. Nut (2) 8.   Clamp 27.  Screw  (4) 46.   Panel   assembly 9.  Fastener  pin  (3) 28.  Panel 47.  Screw  (4) 10.   Grommet(3) 29.  Nut 48.   Nut(4) 11.   Stud(3) 30.   Screw 49.   Screw(4) 12.   Battery   indicator 31.   Strap 50. Nut (4) 13.  Lampholder  (2) 32.  Screw  (2) 14. Lamp (2) 51.  Screw  (4) 33. Nut (2) 52. Nut (4) 15.    Hourmeter 34.   Transformer 53. Wiring harness 16.   Frequency   meter 35.  Screw  (4) 54.  Screw  (4) 17.   Percent   rated   current   meter 36. Nut (4) 55. Nut (4) 18.  AC  Voltmeter 37. Transformer 56. Frequency transducer 19. Knob (3) 38. Nut (4) 57.  Control  box TS    6115-584-34/6-3(2) Figure  6-3.  Control  Cubicle  (Sheet  2  of  2) a.   Inspect. (1)  Load  Terminal  Board  (TB1).  Inspect  the  load terminal   board   (10,   figure   6-9)   for   physical   damage. Inspect   the   terminals   for   bad   threads   and   security   of connections. (2)   Reconnection   Switch   (S6)   (see   figure   6-10). Inspect   reconnection   switch   (1)   for   physical   damage. Check   that   switch   is   securely   attached   to   control   box (2)  with  four  screws  (3)  and  lockwashers  (4)  in  front and  with  two  screws  (5),  spacers  (6),  lockwashers  (7) and  nuts  (8)  in  back.  Check  that  electrical  connections to  switch  are  clean  and  tight. (3)   AC   Circuit   Breaker   (CB1)   (see   figure   6-10). Inspect   main   circuit   breaker   (9)   for   physical   damage. Check   that   twelve   electrical   connections   to   breaker are   clean   and   tight.   Check   that   breaker   is   securely fastened  to  output  control  box. (4)   Printed   Circuit   Board   Bridge   Assembly   (see figure  6-9).  Remove  four  screws  (11)  and  lockwashers (12)  attaching  side  access  panel  (13)  to  output  control box   (24)   and   remove   panel.   Inspect   printed   circuit board  (23)  and  components  for  physical  damage.  Check that   the   assembly   is   clean   and   securely   attached   to output   control   box.   Check   that   electrical   connections to  board  are  clean  and  tight. (5)   15   Amp   Circuit   Breaker   (CB3)   (see   figure 6-10).   Inspest   15   amp   circuit   breaker   (11)   for   physi- cal   damage.   Check   that   two   electrical   connections   to breaker   are   clean   and   tight.   Check   that   breaker   is securely  attached  to  output  control  box  (2). ring   or   other   physical   damage.   Check   that   two   elec- trical   connections   to   receptacle   are   clean   and   tight. Check   that   receptacle   is   securely   fastened   to   front panel  of  output  control  box  (2)  with  two  screws  (18) and   nuts   (19).   Check   that   receptacle   cover   (16)   and gasket   (17)   are   securely   attached   to   panel   and   that cover   operates   properly. (7)   Linear   Reactor   (Ll)   (see   figure   6-9).   Inspect linear   reactor   (15)   for   physical   damage.   Check   that electrical   connections   are   clean   and   tight.   Check   that reactor   is   securely   attached   to   side   panel   of   output control  box. (8)   Connector   Assemblies   (see   figure   6-9).   In- spect   each   of   the   four   connector   assemblies   (18   and 21)  mounted  to  side  of  output  control  box  for  corrosion or  physical  damage.  Check  that  each  connector  assem- bly  is  securely  mounted  to  side  panel  of  output  control box. (9)   Current   Voltage   Transformer   (CVT1)   (see figure   6-9).   Inspect   transformer   (6)   for   physical damage.   Check   that   electrical   connections   to   trans- former   are   clean   and   tight. (10)   Current   Transformer   (CT1)   (see   figure   6-9). Inspect   transformer   (7)   for   physical   damage.   Check that   electrical   connections   to   transformer   are   clean and  tight. (11)   Wiring   Harness   Assembly.   Inspect   wiring (6)   Convenience   Receptacle   (J14)   (see   figure 6-10).   Inspect   convenience   receptacle   (13)   for   char- harness   for   broken   wires.   Check   for   frayed   or   deter- iorated   insulation.   Check   that   all   terminal   points   are clean,  tight,  and  free  of  damage. 6-11

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing