Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-2. Fabricated Tools and Equipment
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CHAPTER  2 GENERAL NMJNTENANCE  INSTRUCTIONS
Up
TM-5-6115-584-34 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Table  2-2.  Fabricated  Tools  and  Equipment  (Cont)

TM 5-6115-584-34 N A V F A C  Table   2-2.   Fabricated   Tools   and   Equipment Nomenclature Reference    No.    orNSN Material    Required Pump    mounting    fixture O.  375”  cold  rolled  steel Fabrication Instructions: Fabricate   fixture   as   shown   below.   Drill   “F”   (0.255   in.   -0.262   in.   )   depth   thru   countersink   60° to 0.332  in.  diameter.  Tap  0.3125-18 depth Two   holes   located   within   0.005   in.   of   true position. Sketch   or   Diagram: 4 1.250’ T COLD   ROLLED   STEEL DRILL   “F”   (0.255”   -   0.262”) DEPTH   THRU 60” TO   0.332”   DIA. TAP   0.3125’’-18 DEPTH  THRU 2   HOLES   LOCATED   WITHIN   0.005”   OF   TRUE   POSITION 2-2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing