Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: AC OUTPUT CONTROL BOX ASSEMBLY
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure  3-6.  Exhaust  Muffler  Assembly
Up
TM-5-6115-584-12 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Figure   3-9.   Air   Cleaner   and   Shroud   Assembly

TM  5-6115-584-12 NAVFAC  P-8-622-12 TO-35C2-3-456-1 TM-05682C-12 1. Starter 2. Mounting bolts (4) 3. Mounting bracket 4.   Electrical   terminal   (5) 5. Flywheel housing TS     6115-584-12/3-7 Figure  3-7.  Electric  Starter 1. 120VAC outlet 4. Electrical cover  (2) connectors (4) 2. Latches (2) 5. Load terminal board 3. Load terminal cover         6.  Load terminal (4) TS 6115-584-12/3-8 3-17.  AC  OUTPUT  CONTROL  BOX  ASSEMBLY. a. Inspect (see figure 3-8). (1) Control Box Assembly. Check box assembly for  cracks,  dents,  or  other  physical  damage.  Inspect to  see  that  covers  (1)  for  both  120  volt  ac  outlets operate properly. Check latches (2) securing load terminal board cover (3). Check to see that cover (3) check that clamp (17) attaching dust cap (18) to house- for load terminal board opens and closes properly. Check to see that electrical connecters (4) are clean and securely mounted. (2) Load Terminal Board Assembly. Check con- dition of load terminal board (5) and load terminals (6) for cleanliness and tightness. Make certain that the load leads are secured to terminals. 3-18. AIR CLEANER ASSEMBLY. a.  Inspect   on   Equipment   (see   figure   3-9).   On   ASK equipped  generators,  open  AIR  INTAKE  and  AIR  CLEANER access doors. (1) Housing. lnspect housing (8) for dirt, grease, dents  or  other  physical  damage.  Check  to  see  that housing is securely attached to bracket assembly (1). 3-14 Change  7 Figure 3-8. AC Output Control Box Assembly ing is secure and arrows on dust cap are pointing up. check that two clamps (7) holding cold weather operation intake hose (19) are secure. (2) Bracket Assembly. Inspect bracket assembly (1) to see that it is securely fastened to generator housing (2). check that capscrews (3) and lockwashers (4) which attach bracket to generator housing, and three spacers (5) are in place. (3) Inlet Shutter (see figure 3-10). Check inlet shutter (6) to see that it slides easily from COLD WEATHER to NORMAL WEATHER position and back. (4) Air Flow Indicator (see figure 3-10). Check air flow indicator (7) for dirt,  grease, or physical damage.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing