Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (Cont.)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Table  3-2.  Operator/Crew  Preventive  Maintenance  Checks  and  Services  (Cont.)
Up
TM-5-6115-584-12 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Table  3-2.  Operator/Crew  Preventive  Maintenance  Checks  and  Services  (Cont.)

TM   5-6115-584-12 NAVFAC   P-8-622-12 TO-35C2-3-456-1 TM-05682C-12 B-Before Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (Cont.) NOTE Within designated interval, these checks are to be performed in the order listed. Item No. Interval D-During A-After W-Weekly M-Monthly Item To Be Inspected Batteries Fuel strainer and filters Fuel tank Acoustical Suppression Kit (ASK) Front Panel Assembly Day Tank Procedures Check  for  and  have  repaired or  adjusted  as  necessary NOTE If the Generator Set is not going to be operated for two weeks or more, disconnect the negative cable from the battery. The Generator Set will be ready to go upon reconnection of the negative cable. Even if the Generator Set is operated every day, the battery may still run down. A run down battery does not have time to be recharged. Run the Generator Set for at least 30 minutes at rated speed. Allow extra running time if the preheater was used, or if starting took  several  tries. Check battery electrolyte levels. Proper level is 3/8 inch above plates. Use clean water (distilled if avail- able). NOTE Fuel  system  temperature  must  be  above  freezing when draining water and sediment. Drain water and sediment from strainer, primary and secondary filters. Allow to drain until fuel runs clean (para 3-20). Drain water and sediment. Allow to drain until fuel runs clean (para 3-13). Make a visual inspection of the ASK for loose or miss- ing hardware, and for any bent, cracked or broken parts.  Tighten  all  loose  hardware. Ensure that front panel assembly is free from obstruc- tions  or  accumulation  of  dirt,  leaves,  debris  which would hinder air flow. Drain water and sediment. NOTE In  freezing  weather  drain  shortly  after  operation. A11ow to drain until fuel runs clear. Section   IV.   TROUBLESHOOTING Equipment is Not Ready/ Available if: 3-10. MALFUNCTIONS NOT CORRECTED BY USE OF  THE  TROUBLESHOOTING  TABLE. 3-9.  GENERAL This section contains troubleshooting information for locat- ing and correcting operating troubles which may develop in This manual cannot list all malfunctions that may occur nor the Generator Set. Each malfunction for an individual com- all test or inspections and corrective actions. If a malfunc- ponent, unit, or system is followed by a list of tests or inspec- tion is not listed or cannot be corrected by listed corrective tions which will help you to determine probable causes and actions,  notify  your  supervisor. corrective  actions  to  take.  You  should  perform  the  test/ inspections and corrective actions in the order listed. 3-6 Change 9