Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-4. Load Terminal and Reconnection Configuration
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Table  2-2.  Reconnection  Switch  Positions
Up
TM-5-6115-584-12 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Section II. OPERATION UNDER UNUSUAL CONDITIONS

load  equals  a  100%  meter  reading  for  maximum  rated load.  A  1.0  power  factor  load  equals  a  80%  meter reading  for  maximum  rated  load. i.  During  operating  of  the  Generator  Set  observe the  following. (1) Check % rated current meter. (2) Check fuel level gauge periodically. (3) Oil pressure gauge located on engine should indicate 20 psi minimum. (4)  Check  running  time  meter  periodically  in order  to  perform  preventive  maintenance  check  and TM  5-6115-584-12 NAVFAC    P-8-622-12 T O - 3 5 C 2 - 3 - 4 5 6 - 1 TM-05682C-12 (5) Battery indicator should indicate yellow while battery   is   charging,   green   when   battery   is   fully charged. (6) AC voltmeter should indicate 120V., 208V. or 240V.  depending  on  load  connection. (7)  Frequency  meter  should  indicate  60  Hz  (at full  rated  load). j. During operation, inspect for leaks, paying par- ticular attention to engine fuel and oil lines and con- services  at  proper  intervals. nections. Figure  2-4.  Load  Terminal  and  Reconnection  Configuration 2-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing