Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TABLE 2-1. TOOLS AND SUPPORT EQUIPMENT, TEST, REPAIR CALIBRATION AND HANDLING (CONT)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
TABLE 2-1. TOOLS AND SUPPORT EQUIPMENT, TEST, REPAIR CALIBRATION AND HANDLING (CONT)
Up
TM-5-6115-545-34 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
TABLE 2-1. TOOLS AND SUPPORT EQUIPMENT, TEST, REPAIR CALIBRATION AND HANDLING (CONT)

TABLE  2-1. TOOLS  AND  SUPPORT  EQUIPMENT,  TEST,  REPAIR  CALIBATION  AND  HANDLING  (CONT) REFERENCE ITEM Voltmeter  0-50 Vdc Auto transf ormer Miliammeter dc, zero center -10, 0, +10 ma Solder gun Test Gage and Hose Ay Test Stand, Actu- ator Test Stand, Mag- netic Voltmeter 0-300 Vac Power supply 208 Vat, 3 phase 47- 430 Hz Wheatstone  bridge Megger 500 Vdc NSN or PART NO Model  901  (65092) 5625-00-124-7254 (or  equivalent) 6625-00-883-9734 3439-00-517-0603 (or  equivalent) 4910-00-774-9343 (or  equivalent) 4940-00-152-2107 (or  equivalent) 1910-00-912-3690 (or  equivalent) Model  904  (65092) 3625-00-927-4451 (or  equivalent) 5625-00-581-2466 (or  equivalent) Fig 8-21 7-5 7-9 7-5 7-9 9-2 13-3 14-5 13-3 8-21 8-21 Para 8-18 7-6 7-6 7-6 7-6 9-2 13-2 14-14 14-16 13-6 14-19 8-18 8-18 USE Load measuring unit test (Bench test) Electro-hydraulic  governor  re- ctifier bridge and feedback winding test (50/60 Hz) Electro-hydraulic  governor  re- ctifier bridge and feedback winding test (400 Hz) Electro-hydraulic  governor  re- ctifier bridge and feedback winding test (50/60 Hz) Electro-hydraulic  governor  re- ctifier bridge and feedback winding test (400 Hz) Generator  removal,  disassembly and test Hydraulic speed control actuator Hydraulic pump assembly (class 1  precise  sets) Hydraulic pump reassembly, in- stallation and adjustment Hydraulic actuator test (bench test) Testing speed switch (bench test) Load measuring unit test (bench test) Load measuring unit test (Bench test) 9-2 Generator,    removal,   disassemble and  test 14-12 14-29 Electric sater motor repair 14-12    14-28   Electric starter inspection and test 14-10 Battery  charging  alternator 14-2 inspection  and  test 2-8 Change 3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing