Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. CONTROLS AND INSTRUMENTS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-4. Voltage Conversion
Up
TM-5-6115-545-12 Power Unit Utility Pack Gas Turbine Engine Driven (Air Research Model PPU85-5) Non-Winterized and (Air Research Model PPU85-4) Winterized Manual
Next
Figure   2-5.   Generator   Set   Controls   and   Instruments   (Sheet   l   of   6)

Section II. MOVEMENT TO NEW WORKSITE 2-7. Dismantling for Movement. WARNING Make   certain   that   engine   generator   set   is not  operating  in  a  standby  mode,  or  con- nected   to   a   parallel   bus. a.   Preparation   for   Movement. (1)   Disconnect   the   load   cables   from   the   load terminal   board   (fig.   2-3)   and   tag   for   identifica- tion. (2)   Remove   the   exhaust   pipe   extension,   if used . (3)   Drain   fuel   (fig.   3-7)   and   coolant   (para 3-41)   if   transportation   by   railroad   is   anticipated or   the   distance   to   be   traveled   is   great. (4)   Refer   to   the   basic   issue   item   list (Appendix  B)  and  make  sure  that  all  items  are present   and   properly   stowed. (5)   Disconnect   the   ground   lead   from   the ground   terminal   stud   (fig.   2-2). (6)   Disconnect   any   other   external   hoses, lines   and   cables,   if   used. (7)  Close  and  secure  all  doors  and  panels. b.  Movement. (1)   If   the   engine   generator   set   is   to   be moved   only   a   short   distance   and   the   terrain   is suitable,   attach   a   suitable   towing   device   to   the towing   openings   of   the   engine   generator   set   and tow   the   engine   generator   set   to   the   new   worksite. (2)   If   the   engine   generator   set   is   to   be moved   a   long   distance,   or   if   the   terrain   is unsuitable  for  towing,  prepare  engine  generator set  for  moving  as  described  in  paragraph  2-7  a. 2-8. Reinstallation   after   Movement. Refer   to   paragraph   2-5   for   reinstallation   after movement  to  a  new  worksite. Section   III. CONTROLS  AND  INSTRUMENTS 2-9.   General. 2-10. Controls   and   Instruments. This   section   describes   and   illustrates   the   various The   purpose   of   the   generator   set   controls   and controls   and   instruments   required   for   generator instruments   and   the   normal   and   scale   readings   of set   operation. the   instruments   are   illustrated   in   figure   2-5. 2-10