Click here to make tpub.com your Home Page

Page Title: Figure 3-6. Alternator Test Leads Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Assembly.
Up
TM-5-6115-465-34 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Figure 3-7. Total Circuit Voltage Test

TM5-6115-465-34
TO 35C2-3-446-2
NAVFAC P-8-625-34
TM06858B/06859D-34
Figure 3-6.
Alternator Test Leads Installation
NOTE (CONT)
(c) Attach a 1/4 inch ring terminal to one
end of the 10 inch lead.
(Refer to the Operator and Organizational
Maintenance Manual for installation in-
(d) Attach a No. 10 ring terminal to one
end of each 5 inch lead.
structions.
(2) Install test leads as follows:
(b) With switch open, compare voltage read-
ings at V1 and V2. The readings should be identical
(a) Attach test leads as shown in figure
NOTE
3-6. Pass the free end of each lead through the venti -
lated band cover (9, figure 3-4).
While checking voltage at V2, check to see
if the reading varies when the cable or the
(b) Install regulator and cover assembly
(2) and secure with screws (1).
connector plug on the alternator cover as-
sembly is disturbed. This could indicate in-
adequate test connections which must be
(3) Check alternator total circuit voltage as
follows :
corrected before proceeding with the tests.
(a) Install alternator in test circuit as
shown in figure 3-7.
(c) If voltage at V2. is low or zero, the alter-
nator positive and negative output circuits must be
NOTE
tested as indicated in steps (4) and (5) below.
The test circuit is identical to the alter-
nator installation circuit. If an operation-
(d) If voltage readings at V1 and V2 are
al generator set is available, the alterna-
identical, proceed with alternator output and voltage
tor may be installed on it for testing.
protector test in step (10) below.
3-12

Privacy Statement - Press Release - Copyright Information. - Contact Us