Click here to make tpub.com your Home Page

Page Title: Assembly.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 3­5. Rotor Assembly Current Draw Test Circuit.
Up
TM-5-6115-465-34 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
Figure 3-6. Alternator Test Leads Installation

TM 5-6115-465-34
TO 35C2-3-446-2
NAVFAC P-8-625-34
TM 06858B/06859D-34
(11) Insert a wire of sufficient stiffness in
(18) Inspect fan for cracks, corrosion, bent
the access hole provided (point A, figure 3-4), to
blades and other damage.
hold the brushes (20) depressed into the brush-
holder (19).
(19) Inspect bearings for pitting, excessive
wear, and other damage.
(12) Install the rotor (50) with assembled
front head (49) into rear head (11), assembled to-
(20) Inspect head assemblies (11 and 49) for
gether with rectifier and stator assembly (40).
cracks, breaks, and corrosion.
(13) Install thru bolts (10).
(21) Inspect all threads for crossing, stripp-
ing, and peening.
(14) Remove wire, inserted in step 3-5d. (11).
d. Assembly.
NOTE
(1) Install positive diode rectifier assembly
(42, figure 3-4) and negative diode rectifier assem-
Perform steps in paragraph 3-5e(l) before
bly (41 ) onto stator assembly (43) and solder diode
proceeding with assembly.
leads.
(2) Using a driver which exerts pressure on
(15) Install capacitor and clamp assembly (27),
the inter race only, install front bearing (52 ) into
screw (25), washers (26), lockwasher (24) and nut
front head (49) and secure with snap ring (51).
(23). Install nuts (22 and 21).
(3) Install cover (54) and support rear bear-
(16) Install capacitor and clamp assembly (28)
ing area of rotor assembly (50) on a suitable press
and brush lead (15).
and fit assembled front head and bearing over rotor
shaft. Using a driver which exerts pressure on the
(17) Install ventilated cover band (9) with
inner race sly, press front head down until front
screws (8).
bearing contacts cover (54) on rotor shaft.
(4) Support front of rotor assembly shaft on
(18) Install all electrical leads that were
tagged and disconnected during disassembly in step
a suitable press. Using a driver which contacts the
3-5b. (2). (See figure 3-4. )
inner race only, press rear bearing (53) onto rotor
shaft until it contacts shoulder on shaft. Remove
(19) Install washer (5), fuse holder (3), and
rotor assembly from press.
nut (4). Resolder leads to fuse holder.
(5) Install spacer (48), woodruff key (47), fan
(20) Install fuse (7) and cap (6).
(46), pulley (45), and nut (44). Torque nut to 35 to 50
ft-lbs
NOTE
(6) Fit front part of insulating bushings (36,
37, 38, and 39) over rectifier studs.
Install test leads as indicated in e.(2)
(7) Position stator and rectifier assembly (40)
below.
into rear head assembly (11).
NOTE
(8) Install rear part of insulating bushings (36,
37, 38 and 39) and washers (31, 32, 33, and 34).
Complete testing of alternator sub-para-
graph e. (2) below prior to completing
assembly.
(9) Install brushholder (19), insulating plate
(18), lockwashers (17) and screws (16).
e.
Testing.
(1) Manufacture test leads as follows:
NOTE
Insure that the contour of the brushes
(a) From No. 8 or No. 10 insulated wire,
correspond to the contour of the com -
cut three lengths, one 10 inches long and two 5 inches
long.
mutator when installing brushes in the
brushholder.
(10) Install brush and spring assemblies (20)
(b) Strip both ends of all three leads and
in brushholder (19).
tin with solder.
3-11

Privacy Statement - Press Release - Copyright Information. - Contact Us