Click here to make tpub.com your Home Page

Page Title: Section II. MOVEMENT TO A NEW WORK SITE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-5. Parallel Connection
Up
TM-5-6115-465-12 Generator Set Diesel Engine Driven Tactical Skid Mtd. 30 Kw 3 Phase 4 Wire 120/208 and 240/416 Volts Manual
Next
REINSTALLATION AFTER MOVEMENT.

TM 5-6115-465-12
TO 35C2-3-446-1
NAVFAC P-8-625-12
TM 06858B/06859D-12
WARNING
mates with the arrow on the
stationary board indicating the
desired operation voltage.
Do not attempt to alter the
position of the voltage
(2) Install and tighten the
reconnection board while the
mounting nuts.
generator set is operating. Make
sure that the generator set is
b. To convert 50/60 Hz precise
not paralleled to another which
set to 50 Hz operation, place
is operating.  Failure to observe
frequency select switch (figure 1-
this warning may result in death
1) on precise relay assembly to 50
by electrocution.
Hz position.
(1) Remove 12 mounting nuts
(figure 2-6) and locate the movable
board until the arrow at its edge
Section II. MOVEMENT TO A NEW WORK SITE
b. Movement.
2-5.  DISMANTLING THE GENERATOR SET
FOR MOVEMENT .
WARNING
Preparation for Movement.
a.
Do not use hoisting equipment or
transporting vehicle with
(1) Disconnect the load
capacity less than 3200 pounds.
leads.
Do not allow the generator set
to swing when it is suspended.
(2) If exhaust extension was
Securely attach the generator
used, remove and install rain cap.
set to the transporting vehicle.
Failure to observe this warning
(3) Disconnect paralleling
may result in serious injury or
leads, if used.
death of personnel or damage or
destruction of the generator
(4) Disconnect auxiliary fuel
set.
line, if used, and store on unit.
CAUTION
(5) Disconnect ground lead,
remove ground rods and store on
To avoid undue side pressures
unit.
which could result in damage to
the lifting frame, use a minimum
(6) Secure all doors and
bridle of 5 feet on the hoisting
panels.
sling.  If acoustic suppression
kit is installed, generator set
must have 1-inch clearance under
bottom panel tray assembly.
(1) Hoisting. Attach a
sling to the generator set lifting
clevises (figure 1-1) for loading
with a crane or movement by
helicopter.

Privacy Statement - Press Release - Copyright Information. - Contact Us