Click here to make tpub.com your Home Page

Page Title: Figure 38. Cylinder head assembly details.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section II. ENGINE COMPONENTS
Up
TM-5-6115-400-35 Generator Set Diesel Engine Driven 200 KW 60 Cycle AC 120/208V 240/416V 3 Phase Convertible to 167Kw 50 Cycle 120/208V 240/416 V Manual
Next
Figure 40. Cylinder head guide studs.

TM 5-6115-400-35
(5) Remove nozzle holder clamps. and fuel
injection nozzles. Remove. rocker arms
and shaft (para 43).
'Remove valve
bridges from the bridge guide pins.
Withdraw push rods from the cylinder
head.
(6) Disconnect upper ends of fuel injection
lines from fuel line connectors in the
rocker arm housing. Remove capscrews,
plain washers, and lockwashers securing
valve rocker housing to cylinder head and
remove  the  valve  rocker  housing.
Remove breather coupling.
(7) Remove cylinder head capscrews and
washers. With a sling similar to the one
shown in figure 39, remove the cylinder
head. Remove cylinder head gaskets.
c. Cleaning and Inspection.
(1) Clean all parts with an approved solvent
and dry thoroughly.
Figure 39. Removing cylinder head.
Figure 38. Cylinder head assembly details.
76

Privacy Statement - Press Release - Copyright Information. - Contact Us