Page Title: Assembly of End Bell and Brush Holder Plate
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 7. Lock torque test
Up
TM-5-6115-400-35 Generator Set Diesel Engine Driven 200 KW 60 Cycle AC 120/208V 240/416V 3 Phase Convertible to 167Kw 50 Cycle 120/208V 240/416 V Manual
Next
Figure 8. Electric starter.

TM 5-6115-400-35
(1) If wick was removed during disassembly,
(2) Inspect  sleeve  bearings  for  wear.
Replace bearing if defective. Check for
saturate a new wick and plug with oil and
install in end bell.
looseness in housing or end bell.
Replace worn or defective bearings.  If
Wick must not be in fill hole.
new bearing is loose in bore, replace
(2) Apply sealer to expansion plug hole and
housing or end bell.
install plug.  Fill reservoir with oil and
install pipe plug.
(3) Inspect wicks for tests, fraying, or wear.
Replace if defective.
(8) If bushing was removed, press a new
bushing in end bell and install expansion
(4) Turn down commutator if grooved or out
plug.
of round.  Undercut mica to a depth of
0.025 to 0.032 inch below surface of
(4) Assemble brush holder plate and end bell
commutator.  Do  not widen slots when
in the reverse order of disassembly but do
undercutting mica.
not install brushes.
(5) Inspect drive pinion for broken or badly
i. Starter Assembly.
worn teeth.  Inspect clutch splines for
(1) If
wicks
were
removed
during
wear and damage.
Inspect shell for
disassembly,  install  wicks  and  plugs
cracked or broken condition.  Check to
following same instructions specified for
make sure pinion will drive into one
end bell ((1) and (2) above).
direction and will slip in opposite direction.
(2) If bushings-were removed, press new
Replace drive clutch if defective.
bushings into housings.
(6) Inspect shift lever, shaft, and solenoid
(3) Assemble starter in reverse order of
plunger for cracks or distortion.
disassembly with the following exceptions
Replace defective parts.
and additions.
(7) Inspect bellows for tears, punctures, and
(4) If field windings were removed, coat
deterioration.
threads of pole shoes screws with a
(8) Inspect solenoid relay case for cracks or
suitable thread sealer before installation.
other damage. Replace if defective.
Varnish inside of frame and winding
(9) Inspect brushes for wear or damage.
assembly.  Leave 0.38 inch from each
end of frame free of varnish.
If damaged, or worn excessively, replace them.
(5) Partially install lever housing lever and
g. Testing.
solenoid plunger before installing drive
(1) To test armature for grounds or short,
clutch. With frame in vertical position and
refer to TM 5-764.
lever housing upward, install nonmetallic
(2) To test field coil windings for open
washer and install drive clutch. Tilt clutch
circuits, connect multimeter probes to the
to engage lugs on shift lever.
Seat
ends of field coil, if multimeter does not
housing making sure bellows is not
read field coil is open and should be
crimped.
replaced.
(6) If new brushes are being installed cover
(3) To test field coil windings  for grounds,
commutator with No.
00 sandpaper
disconnect  field  coil  winding  ground
temporarily install armature, ,brushes, and
connection.  Connect meter probes to
end
bell
and
turn
in
brushes.
field  frame  and  field  connector,  if
Disassemble, remove sandpaper, and
multimeter reads, field coil is grounded,
clean armature and brush holder, plate
and must be repaired or replaced.
assembly.
(7) Install thrust washer on armature shaft
h. Assembly of End Bell and Brush Holder
and install preformed packing
Plate.