Figure 3 (1) . Housing, doors, hood, and panels. (cont)
Up
TM-5-6115-400-35 Generator Set Diesel Engine Driven 200 KW 60 Cycle AC 120/208V 240/416V 3 Phase Convertible to 167Kw 50 Cycle 120/208V 240/416 V Manual
Next
Figure 4. Engine removal and installation.

TM 5-6115-400-35
(24) Install generator front lifting eye (stored in
(8) Remove reconnection panel and tag and
disconnect cables and leads (except
tool box).
cables to AC power circuit breaker).
2 (25) Attach a hoist (with bar) to engine
(9) Remove load connection panel and tag
lifting eyes and a second hoist (with bar)
to the generator lifting eyes.
and disconnect cables.
(26) Remove screws (fig.  4A) from engine
(10) Disconnect wiring harness from AC power
front support bracket.
circuit breaker.
(27) Remove bolts (fig.  4B) which secure
(11) Remove screws attaching rear frame (fig.
generator to base.
3 (3)) to base and use a hoist to lift frame
from base. Control panel doors, rear side
(28) Place engine-generator load on the hoists
doors, and AC power circuit breaker will
(lifting the engine-generator minimum
remain attached to the rear frame.
amount), then carefully move the base
Cables will remain attached to the AC
forward so the fan clears the venturi.
power circuit breaker.
(29) Lift engine-generator with hoists, then
(12) Tag and disconnect leads from current
place an engine stand under the engine.
transformers.
Remove  cables  from
Lower the engine-generator until the
current transformers.
engine is supported by the stand.  The
engine-generator  is  now  ready  for
(13) Remove lifting bracket from rear of
separating the engine from the generator.
engine  with  air  cleaner  attached.
Reinstall lifting bracket.
(30) See figure 4C and separate the engine
from the main generator.
(14) Disconnect fuel line connections from the
electric fuel pumps.
c. Installation.
(15) Disconnect wiring harnesses from the
(1) Assemble engine to generator in reverse
relay box.
order of separation. See figure 4.
(16) Drain fuel from the day tank.
Note. Install two (2) dowels in flywheel (in
(17) Remove  screws  attaching  accessory
opposite tapped holes) to guide the
frame (fig.
3 (1)) to base and to
coupling discs and the blower.
The
accessory frame support. Use a hoist to
dowels can be made by removing the
remove accessory frame with relay box,
heads from 5/8 x 3 1/4 capscrews.
electric governor control unit, electric fuel
(2) After dowels are installed in flywheel,
pumps, and current transformers
move generator toward flywheel with
attached.
Remove
accessory
holes in coupling and blower over the
frame support.
dowels, then move generator into position
(18) Remove day tank.
against the engine flywheel housing and
secure  with  twelve  capscrews  and
(19) Remove screws attaching center support
lockwashers.
(fig.  3 (1)) to base and use a hoist to
remove center support (with center doors
(8) Insert four coupling to flywheel capscrews
attached).
and locking plates, remove the dowels,
and  then  insert  the  four  remaining
(20) Remove nuts from fan guard.
capscrews with locking plates.
(21) Drain coolant and disconnect radiator
29. Main Generator
hoses from engine.
a. Removal.
(22) Disconnect oil drain hose from engine.
(1) Refer to paragraph 28b and follow steps
(23) Remove
exhaust
pipe
clamp
at
(1) to (17) inclusive.
turbocharger end.