Click here to make tpub.com your Home Page

Page Title: Chapter 4. ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section IV. TROUBLESHOOTING
Up
TM-5-6115-376-13 Generator Set Diesel Engine Trailer Mounted PU-407/M and Truck Mounted PU-699/M and PU-408/M and PU-700/M Manual
Next
Table 4-1. Preventive Maintenance Checks and Services

TM 5-6115-376-13
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Section 1. SERVICE UPON RECEIPT OF MATERIEL
4-1. Inspecting and Servicing Equipment
No additional instructions required at organiza-
tional maintenance level (para 2-1).
Section Il. REPAIR PARTS, SPECIAL TOOLS AND EQUIPMENT
0641) and an AN/URM-105 multimeter (TM
4-2. Tools and Equipment
..
11­6625-203­12) for testing power cables and
TooIs, equipment, and repair parts issued with or
switching is required.
authorized for the generator sets are listed in the
basic issue items list, Appendix C of this manual.
4-4. Maintenance Repair Parts
4 - 3 . Special Tools and Equipment
Repair parts and equipment are listed and illus-
There are no special tools or test equipment re-
trated in the repair parts and special tools lists
quired for organizational maintenance; however,
covering organizational maintenance for this
the general mechanics tool kit (FSN 5180-754-
equipment in TM 5­6115­376-23P.
Section Ill. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
4-5. General
4-6. Preventive Maintenance Checks and
Services
For quarterly preventive maintenance checks and
Table 4­1 is a list of the quarterly preventive
services for the 45KW generator sets refer to
maintenance checks and services for components
TM 5-6115-239-10 (Model 4070) or TM 5-6115-
not covered elsewhere. In addition to the quarterly
247-15 (Model 54400). For the 60KW generator
maintenance procedures; organizational mainte-
sets refer to TM 5-6115-425-12. For the M200A1
nance must also perform the daily steps outlined
trailer, refer to TM 9-2330-205-14; and for the
M54A2 cargo truck refer to TM 9-2330-211-10.

Privacy Statement - Press Release - Copyright Information. - Contact Us