| ||||||||||
|
|
![]() ![]() TM
5-6115-376-13
Page
Title
Fig. No.
Synchronizer assembly power receptacle-connector, parallel receptacle-connector, bus
barandpower leads, removal and installation. (sheet 2 of 2). ____________________________ 4-18
S y n c h r o n i z e r assembly toggle switches removal and installation. ---------------------------- 4-19
Connector-receptacle and cover (switchbox removal and installation) (Sheet 1 of 2). __________ 4-20
Connector-receptacle and cover (switchbox removal and installation) (sheet 2 of 2).-------------- 4-21
Lowering of DE generator unit into skid platform. ________________________________________ 5-4
Skid
platform
holddown
assembly.
------------------------------------------------------
Lifting
sling
assembly
in
use.
-----------------------------------------------------------
S k i d platform, ready formounting of DE generator unit, ----------------------------------- 5-7
Distribution box circuit breakers andammeters, removal and installation. -------------------- 6-2
Lamp socket assemblies and chain removal and installation (distribution box, all
units).
_______________________________________________________________________________
Distribution panel, removal and installation (all units). ___________________________________ 6-4
Current transformers, removal and installation (distribution box, all units) ------------------- 6-6
Portable distribution box panel components, removal and installation -------------------------- 6-6
Automatic switch assembly, removal and installation. ______________________________________ 6-7
Automatic switch disassembly and reassembly. -------------------------------------------- 6-8
Automatic
switch
adjustment.
-----------------------------------------------------------
Relay switch assembly and electronic synchronizer switch assembly, removal and
installation. __________________________________________________________________________
Switchhox circuit breaker switches, removal and installation (sheet 1 of 2).___________________ 6-12
Switchbox circuit breaker switches, removal and instillation (sheet 2 of 2). __________________ 6-13
iii
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |