TM 5-3810-306-34
2. INSTALL LENGTH CABLE (6) TO BOOM NOSE
INSTALLATION:
RECEPTACLE (4).
1. INSTALL
LENGTH/ANGLE
CABLE
REEL
a. Unreel length cable (6) from cable drum (1) and
ASSEMBLY (16).
thread through the roller and cable guides along
the boom.
a. Position cable reel assembly (16) in mounting
brackets (2) and secure with bolts (14) and
b. Wrap length cable (6) around tube (8) the same
washers (15).
number of times as noted on removal and
secure with tie wraps.
b. Remove connector nut (13) and rubber insert
(17) from strain relief connector.
CAUTION
c. Insert cable (12) through connector nut (13) and
rubber insert (17). Push both back over outer
To prevent damage to length cable (6)
insulation of cable (12).
there should be no slack between
tube (8) and cable reel assembly (16).
d. Insert wires and inner insulation of cable (12)
through strain relief connector and into cable reel
c. Remove connector nut (7) and rubber insert (17)
assembly (16).
from strain relief connector on boom nose
receptacle (4).
NOTE
d. Insert length cable (6) through connector nut (7)
Ensure proper contact between outer
and rubber insert (17). Insert length cable (6)
shield of cable and metal insert of
into boom nose receptacle (4). Push rubber
insert (17) and connector nut (7) onto strain relief
strain relief connector.
connector and tighten connector nut (7).
e. Slide rubber insert (17) and connector nut (13)
e. Connect core wire to pin 6 and shield wire to
onto strain relief connector and tighten connector
ground terminal on insert (18) of boom nose
nut (13).
receptacle (4).
f. Connect wires of cable (12) to terminal block in
f. Install insert (18) in boom nose receptacle (4)
cable reel assembly (16) as tagged.
and secure with screws (5).
g. Preload cable drum (1) by turning drum 5 to 8
g. Plug jumper/dummy plug (3) into boom nose
turns counterclockwise. Clamp cable drum (1) to
receptacle (4).
mounting bracket (2) to prevent unwinding.
14-12