|
| |
Back Procedural Steps | Up TM-9-2320-356-BD Truck Tractor Line Haul: 52 000 GCWR 6x4 M915A3 Manual | Next Option 5: Flare Tube Coupling |
TM 9-2320-356-BD
5.
Solder the tubing at the swaged joint.
6.
Operate the system and check for leaks.
7.
Record the BDAR action taken.
When the mission is completed, as soon as
practicable, repair using standard maintenance procedures.
Option 4:
Nonflared Tube Coupling.
WARNING
Make sure coupling meets the psi requirement of
the system.
A coupling that breaks apart can
damage equipment and injure personnel.
1.
Cut damaged area from tubing.
2.
Square off tubing ends.
3.
Install a compression coupling into damaged line. If line is too short to
repair, add a new piece of tubing to make up the distance and use two compression
couplings.
4.
Operate the system and check for leaks.
5.
Record the BDAR action taken.
When the mission is completed, as soon as
practicable, repair using standard maintenance procedures.
3-25
|