|
| |
Back ASSESSMENT PROCESS | Up TM-9-2320-356-BD Truck Tractor Line Haul: 52 000 GCWR 6x4 M915A3 Manual | Next Vehicle/System Assessment (Cent) |
TM 9-2320-356-BD
Chart 2-1.
Vehicle/System Assessment.
ITEM/ACTION
FAULT ISOLATION
BDAR REFERENCE
NOTE
Items checked in this procedure must work to provide minimum functional
t a c t i c a l c a p a b i l i t y .
Even if all systems work, the vehicle may be unsafe
and may not satisfy normal required operating capabilities or may not
receive mission-essential maintenance.
CHAPTER 13
CHAPTERS 9, 11, and
CHAPTERS 3, 5,
6, 7, and 8
2-5
|